Laserfiche WebLink
~~hNN <br />Extension of the line farther west should also be con- <br />sidered because the cost of pumps for proposed future home- <br />sites would. go a long way toward paying for the installa- <br />tion of the water main which would provide better fire <br />protection with the possibility of lower insurance rates. <br />L~ungren and Graham will take care of making contacts <br />regarding connection. <br />Telephone It v~ras moved by 5havor, seconded by Coppini and unani- <br />Listing moilsly voted to authorize rlorthwes+:ern Lell Telephone <br />Company to list our telephones as outlined in their letter <br />of December 9th, signed by Joan Bigelow. <br />Falcon It was moved by Nilsen, seconded by Coppini and unanimously <br />Woods No. 1. voted to pay Ramsey County ~+a2607.16 for the work done by <br />them in Falcon y'4~oods ATo. 1. <br />Alley Assess- It was moved by Shavor, seconded by Nilsen and unanimously <br />menu . voted to adopt the following resolution: <br />R~OLliTION DECLARLNG COST TO DE ASSESSED A~1D ORDERING <br />PREPARATION OF PROPOSED ASS~SSp~ENTS FOR ALLEY L~4PROVE~r'ENTS: <br />WHEREAS,, the following alleys have been improved by resur- <br />facing and the contract price, the expenses incurred and <br />the total cost of each of the improvements are as follows: <br />~ Alley - Block 7, Cables Hamline Heights (alley between <br />Iowa, Hoyt from Pascal to Albert) ~ <br />Total construction cost X2527.54 <br />Engineering 11.2$ of ~6l~6.91 266.53 <br />Advertising tc1.2% of X19.69 8.11 <br />Assessment roll 1~ of 2527.5l~ 25.27 <br />Legal Fees lt1.20 <br />~G~$. ~~ <br />___ / Alley - Block 8, Cables Hamline Heights (alley in block <br />.,bound by Albert, Iowa, Hamline & Hoyt) <br />Total Construction Cost X3052.33 <br />Engineering X9.8% of 646.91 322.16 <br />Advertising 1~9.8~ of 19.69 9. ail <br />Assessment roll 1~ of 3052.33 30.52 <br />Legal Fees 49.80 <br />~3 2 <br />-. Alley - Block 12, Northome 3rd Add. (alley t_ound by .Arona, <br />` California, Pascal and Idaho) <br />Total Construction Cost ~ 555.13 <br />Engineering 9$ of 646.9: 58.22 <br />Advertising 9~ of 19.69 1.77 <br />Assessment Roll 1~ of X555.13 5.55 <br />Legal Fees 9.00 <br />9~ 2~9. 7- <br />and the total of these improvements is to be paid by the <br />property ovmers benefited; <br />11 <br />1 <br />i <br />PdOW THE?',EF'ORE, ;?E IT RESOLVED Bx the Village Council of <br />