Laserfiche WebLink
1389 <br />in and does not get in as part of this improvement. This assess- <br />ment covers your share of the cost of laying the main. If the pump- <br />ing station is to be part of this proceeding, we ha~.~e to go ahead <br />with it almost immediately. If we do not get it in as part of <br />this improvement, it stands on its own feet. We don't know yet <br />whether it will be necessary to put in a pumping station. This <br />X7.25 per foot is the entire cost to be assessed for putting the <br />watermain where it is at the present time. <br />Bradley, 1865 Do we have water without the pumping station? <br />W. Larp. <br />Ljungren P~:4inimum pressure is 18#, and, normally, during theday it is running <br />26 or 27# - adequate to supply a home water system. <br />Gasparro The pressure is pretty good. It is not what it should be but it is <br />not too bad. <br />Weigt I have good pressure. <br />Lee Why can't the cost of this watermain be spread over the whole village? <br />Nilsen Because the other people have paid for their water. Only benefitted <br />property can be assessed. <br />Labalestra l~sn does the assessment have to be Maid? <br />Graham That hasn't been determined yet. I think it will be over a period <br />of 20 years at b~ interest. That's the way mast assessments were <br /> set up. The Tatum Street and Alley Assessments were spread over a <br /> ten year period but the sewer assessment 20 years. You will have <br /> the right to pay it up within 30 days from the day the assessment <br /> is anrroved without interest. Before the end of this year, with <br /> interest from the date the assessment was approved to December 31st. <br /> After that, you will be assessed 1/20 each year and 6~ interest. <br /> The first assessment, if we pass it tonight, will come in with your <br /> 1960 taxes, payable in 1961, and it will include interest to the end <br /> of 19b1. <br />Bradley You will be paying interest a year in advance. <br />Graham If you pay before December 31st, you will be paying interest from <br />tonight. <br />Labalestra There are some buildings going in on,Tatum this Spring. Are we go- <br />ing to provide water for them? They will want water about 300' <br />north of Larpenteur. <br />Graham The thing to do is take a petition to the adjoining property owners. <br />If a petition is submitted signed by 35~ of the affected property <br />owners, we will set up a hearing. If passed, the work could be done <br />by private contractors on a cash basis, or an assessment basis by <br />advertising for bids <br />Sipes Is the extension on Fairview going to be assessment or cash. <br />Nilsen Assessment. <br />V~eigt Was Farmer's Union assessed for the Larpenteur Avenue line? <br />