Laserfiche WebLink
16~?~ <br />Drainage Installation of the catch basins at Holton and Garden <br />is scheduled for the first of next week if possible. <br />Flat Catch Basins will be put in so the same castings <br />can be used if, at a later date curb and gutter are put <br />in. <br />Sidewalks The sidewalk referred to was inspected. It has been <br />raised about 1?"' by tree roots. There are others in the <br />same block where the same thing has happened. The <br />Engineers will make a complete survey and recommendations. <br />Attorney Galvin reported the Village could proceed under <br />the nuisance ordinance which might enable us to require <br />the owner to remove the tree. ~ notice should be served <br />on the owner. We could proceed under Ordinance 35 which <br />is broad enough to include cutting roots. Under Ordinance <br />55, all owners have to be notified and a date set for a <br />hearing. If the Village went in and cut the roots under <br />the Nuisance Ordinance, the Village would have to pay the <br />costs. <br />Snell-Idaho Mayor Nilsen will check his records to see what the residents <br />Playground agreed to do in connection with landscaping the Iowa play- <br />grounds. <br />Falcon Woods The Gage property has been cleaned up by Ryan Landscaping. <br />Ryan will come back later and correct drainage by re- <br />shaping and sodding the Roselawn ditch East of Prior on <br />the south side. <br />Pumv: Lemberg presented information he had. on a pump for the Iowa <br />Playground but will get additional prices and report later. <br />He estima+ed a 3 to 500 gallon pump out the swale section <br />in about 15 hours. Pump would cost around a thousand <br />dollars and last about 10 years. A 4" trash pump was <br />recommended. <br />?3udget The surfacing on Arona should be taken care of as soon as <br />possible. It will cost about three thousand dollars of <br />State Aid Funds. They suggest we hold the rest of the 1962 <br />State Aid Allotment until 1963 when we should have enough <br />funds to proceed. They would like to do something about <br />Crawford from Arona East and as far up Simpson as necessary <br />to correct drainage. Simpson should be cut down back to <br />wherethere is a good grade; the present base removed; the <br />existing surface used as fill and a new surface installed. <br />They recommend that the Council adopt a policy of not doing <br />any ma3or work on any streets unless curb and gut„„ter is first <br />installed. The work at Crawford and Simpson would cost <br />about ~ix.:thousand dollars without curb and gutter. It <br />would also cost about fifteen hundred dollars for curb and <br />18"' gutter at X2.50 per foot. <br />They would like to set up a program where the Village would <br />take one street a year, put in an adequate base, surface, <br />and curb and gutter. Each year do one street so it is done <br />well. <br />i~ <br />1 <br />1 <br />