Laserfiche WebLink
• <br />RESOLUTION NO. 2005-11 <br />RESOLUTION ORDERING PREPARATION OF FEASIBILITY REPORTS <br />FOR ROSELAWN STREET RECONSTRUCTION PROJECT <br />September 28, 2005 <br />WHEREAS, the Council has reviewed the street construction needs of Roselawn Avenue in the <br />City and has tentatively selected the segment of Roselawn between Snelling and Hamline <br />Avenues for reconstruction in 2006; and <br />WHEREAS, it is proposed to improve this section of City of Falcon Heights street system as <br />described above by completing the following work: sidewalk construction, bituminous paving, <br />concrete curb and gutter, storm sewer, and necessary appurtenances, and to assess the benefited <br />property for all or a portion of the cost of the improvement pursuant to Minnesota Statutes, <br />Section 429.011 to 429.111: <br />NOW THEREFORE BE IT RESOLVED by the City Council of the City of Falcon Heights, <br />Minnesota as follows: <br />1. The .segment of Roselawn Avenue between Snelling Avenue and Hamline Avenue is hereby • <br />approved for consideration of reconstruction. <br />2. The proposed improvements are referred to the City Engineer of Roseville for study and she <br />is instructed to report to the Council with all convenient speed, advising the Council in a <br />preliminary way as to whether they should best be made as proposed or in connection with <br />some other improvements, and the estimated cost of the improvements as recommended. <br />Moved by: Approved by: <br /> Susan L. Gehrz, Mayor <br /> September 28, 2005 <br />GEHRZ <br />KLTETTEL In Favor <br />LAMB <br />LINDSTROM Against <br />TALBOT Attested by: Heather M. Worthington <br /> City Administrator <br /> September 28, 2005 <br /> <br />