My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCAgenda_94Jul25
FalconHeights
>
Committees and Commissions
>
Planning Commission
>
Planning Commission Packets
>
199x
>
1994
>
PCAgenda_94Jul25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2009 8:12:43 AM
Creation date
7/7/2009 8:45:57 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• PROJECT OBJECTIVES <br />• To develop an image for Larpenteur Avenue which draws from the <br />unique and significant urban design and natural resource elements <br />that frame it. <br />• To create linkages across the street which minimize the impact of <br />Larpenteur Avenue as a barrier. <br />• To minimize the potential adverse impacts of an improved <br />Larpenteur Avenue on adjacent land uses. <br />• To bring the public and representatives of major corridor elements <br />into the process as active participants. <br />• WORK PROGRAM <br />Phase i - Streefscape Plan <br />Phase 1 will include the following: <br />1. Abroad corridor evaluation including photoanalysis and <br />mapping, to develop an understanding of the relationship of <br />the corridor to its surroundings and identify areas that may <br />offer streetscape opportunities or require special treatments to <br />minimize roadway impacts. <br />2. The conduct of individual meetings (3 estimated) with key <br />players including the University of Minnesota, the City of <br />_ . Falcon Heights, the Fair Board, Coffman representatives, and <br />representatives of the Gibbs Farm and School to generate con- <br />cepts and ideas which relate to each and solicit project support <br />and understanding. <br />3. The formulation of streetscape plans and alternative concepts <br />for focus areas including street lighting, pavement treatments, <br />bus stops, landscaping, grading, entries and signage elements. <br />Final streetscape plans, at a schematic design level will be <br />• performed on AUTO CAD. <br />Proposal - Larpenteur Avenue streetscape Plans Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.