My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-28-05 Council Minutes
>
City Council Meeting Minutes
>
2000-2009
>
2005
>
09-28-05 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 1:41:40 PM
Creation date
6/6/2008 2:15:01 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES <br />CITY COUNCIL <br />SEPTEMBER 28, 2005 <br />legal requirements, and noted that the City's only authority in the regard is <br />to ensure that these legal requirements are met. Blesener also noted that <br />the proposed lots meet the City's minimum requirements. <br />Blesener read a letter from David Crary, Sunset Court, dated September <br />27, 2005 opposing the development. <br />Dr. Jim Allan, McMenemy Street, asked the length of the segment of <br />pipeline that is proposed to be lowered. Von Riedel indicated that he has <br />the document at his office which gives this information; however, he does <br />not recall the length of the pipe to be lowered. <br />Gardener stated that he did not specifically recall, but estimated Che length <br />at about 150 feet. He noted thaC Magellan is looking to constrain Che <br />construction to the width of Dayspring's Viking Drive loC. Gardener then <br />described how the pipeline would be lowered. <br />Blesener asked if Magellan has experience in lowering pipelines. He also <br />asked if Chere would be additional wear on the pipeline from the bends that <br />would be installed. Gardener replied that Magellan will do the work and <br />they have lowered pipelines in other areas. He did not anticipate <br />additional stress on the pipeline for the bends that would be installed. Von <br />Riedel also noted Chat Magellan will be on site during the entire <br />construction of infrastructure for The Preserve. <br />Clifford Hill, Edgerton Street, expressed concern about the additional <br />traffic to the area from this development as well as the Gervais Hills <br />development currently under construction. Blesener indicated Chat he has <br />walked this area extensively and estimates there are 150 homes as well as <br />two entrance/exiC points into the neighborhood. Blesener did noC feel the <br />addition of 14 homes for The Preserve as well as Che addition of the <br />Gervais Hills homes would have a significant impact on traffic. <br />Jim Allan stated thaC he disagreed. <br />Vance Johnson reported that the Magellan pipeline crosses his property. <br />He further reported that there have been a couple of breaks on his land, <br />and was concerned about contaminated soils. <br />Allan pointed out that a letter from the PCA indicates that any <br />development in this area or the surrounding area would be subject to soils <br />testing. <br />The City Administrator reported that the City's standard development <br />agreement stated that there must be compliance with all State and Federal <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.