My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-28-2016 Council Packet
>
City Council Packets
>
2010-2019
>
2016
>
09-28-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2019 10:28:19 AM
Creation date
9/23/2016 5:26:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
portion of South Owasso Boulevard. Zoning designations on all sides of the property <br />are I-P, Industrial Park. <br /> <br />The applicant is seeking the ability to construct a second building on the parcel, allowing <br />for additional outdoor storage behind both the existing and new buildings. The plan <br />provides the following: <br /> <br /> <br />Lot 1 <br />Existing Building – 5,000 square feet (no change) <br />Lot Area - 114,514 square feet <br />Outdoor Storage – 1,555 square feet* <br /> <br />*This is the amount as labeled, however the dimensions appear to show <br />an area of approximately 9,000 square feet <br /> <br />Parcel B <br />New Building – 10,170 square feet <br />Lot Area - 89,919 square feet <br />Outdoor Storage – 14,863 square feet <br /> <br />The applicants will need to confirm the actual lot areas, since it appears from Ramsey <br />County property records that the existing property is just over 114,500 square feet in <br />area. The distribution of this lot area between the two proposed parcels will need to be <br />verified. <br /> <br /> The submitted plans show a new building, 20 feet in height, with a series of awnings <br />over future tenant entrances, along with entrance doors, overhead doors, and sign <br />panel locations for up to five tenant occupants. It was staff’s previous understanding <br />that Precision Tree would retain their existing building, and occupy additional space in a <br />portion of the new building as well. It is not clear if that continues to be part of the <br />proposal. <br /> <br />The building plan shows an exterior material of rock-faced concrete block, glass entry <br />doors, and overhead access doors facing South Owasso. The site plan shows parking <br />all along the building front, so there may be an issue with overhead door access and <br />parking supply. The applicants should specify how these conflicts might occur, and be <br />addressed. The general I-P standards would not permit truck dock locations in the front <br />yard areas – the applicants would have to show the doors will be used for access to <br />inside loading only, and not for the storage of large trucks. <br /> <br />For PUD zoning, the City creates a customized zoning district that applies to the site in <br />question, detailing uses and performance standards that are specific to this area only. It <br />is expected that the PUD district for this site would incorporate much of the language <br />from the I-P, Industrial Park District, but with some accommodations to the outdoor <br />storage amounts. Masonry buildings would continue to be the standard, and other <br />performance standards of the I-P District would be adopted by reference. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.