Laserfiche WebLink
more major enhancement.) <br />4. Edgerton Tunnel (listed under Power Line Trail) - $200,000. This number is <br />hopefully estimated on the high side. The total project cost estimated at $400,000 <br />with Ramsey County paying 50%. <br />5. Power Line Trail (Payne to Edgerton) - $75,000. This was listed at $31,050 in last <br />year’s budget, but staff feels that number is too low given the length of the trail <br />and crossing the island on Payne. <br />6. Power Line Trail (Edgerton to Pioneer Park) - $200,000. This was listed at <br />$138,000 last year, but to build it sooner may take fencing to enable construction <br />through the truck farming area (if at all). <br />7. Scoreboard for Pioneer Soccer Field - $10,000 (may be offset by contributions <br />from field users). <br />8. Screening of Portable Restrooms at various parks - $5,000 <br />9. Clearing of NW Corner of Spooner and area immediately north of <br />Tennis/Pickleball Courts - $20,000. <br />10. Thunder Bay Park Information Sign – $1,500 <br />11. Spooner park entrance monument sign at Centerville Rd and Eli Road – $17,250 <br />10. Replacement of lower shelter at Spooner Park, run water and sewer – $419,750 <br />11. Install trail - Country Drive & South Owasso loop along waterworks trail – <br />$250,000 <br />12. Pioneer Park – install a flag pole with lighting at entrance – $6,900 <br />13. Pioneer Park – install new drinking fountain near tennis courts – $23,000 <br /> <br />New/Nonprogrammed Items: <br />• Gervais Mill Park Drinking Fountain – $10,000 <br />• Noel Drive Sidewalk – City Hall Lot to Gervais Trail – $100,000 - $150,000 depending on design <br />option chosen with higher number associated with retaining wall work. (Lower cost would be <br />placing sidewalk directly behind curbing with higher cost associated with the sidewalk being <br />located on middle level of walls by water tower. Note: Numbers lower than attached report given <br />part of sidewalk was constructed in 2017.) <br />• Waterworks, Sextant, and Sunset Court Trail Loop – $230,000 <br />• Reforestation for All Parks – $25,000 per year <br />• Purchase of Sculley Property for Nature Area - $275,000 <br />• Installation of Bike Racks around the City - $300 - $500 <br />• Installation of Bike Repair Station/s - $1,100/ea. <br />• Dog Play Products at Demont Dog Park - $3,000 - $4,000 <br />• Permanent Dog Park Site – $10,000 - $30,000 (Not including parking or water source) <br />• Community Garden - $5,000 - $10,000 (Not including parking or water source) <br />• Additional Parking at Spooner Park (Increase the bituminous lot size) – $60,000 <br />• Benches throughout the City - $1000/ea. <br />• New Trash Receptacles around City - $500 - $800/ea. <br />• Other??? <br /> <br /> <br /> <br /> <br />Attached are the following: <br />• General Capital Improvement Fund #400 <br />• Park Land Acquisition Fund #456 <br />• 10% Gambling Fund #408