Laserfiche WebLink
<br /> <br />- 4 - <br /> <br />B. PARK VIEW COURT <br /> <br />Park View Court is a cul-de-sac street running north approximately 280 feet from <br />Little Canada Road. The street has surmountable concrete curb and gutter and <br />nearly two-thirds of the curb has advanced deterioration along the toe of the curb <br />where it meets the bituminous. As with most new developments surmountable <br />curb was utilized to provide greater flexibility of driveway locations so the curb <br />was not depressed at the driveways and no concrete aprons were installed. All <br />driveways are bituminous. The pavement has some longitudinal and transverse <br />cracking, but the most significant cracking is along the bituminous edge meeting <br />the curb. There are also several areas where the bituminous has settled below <br />the curb. In general the west end of the street is in better shape than the middle <br />and east portions of the roadway. Sanitary sewer and water service are provided <br />to all properties along the street. <br /> <br />C. CONDIT STREET & BURKE LANE <br /> <br />The road sections proposed for improvement lie south of Nadeau Road and <br />represent the last streets in this neighborhood that have not been upgraded to an <br />urban section with concrete curb and gutter. Condit Street currently has a 20 <br />foot bituminous driving surface and bituminous curb. It lies within 30 feet of right <br />of way and the west edge of the street is very close to the west edge of the right- <br />of-way. Burke Lane currently has a 29 foot bituminous driving surface with <br />bituminous curb and lies within 60 feet of right-of-way. There is a small portion of <br />the west end of Burke Lane that has been improved with surmountable concrete <br />curb and gutter approximately 32 feet wide. The entire project area drains to two <br />catch basins on Burke Lane which ultimately discharge south into Gervais Creek <br />and the all properties are served with sanitary sewer and watermain. <br /> <br /> <br />VI. INFORMATIONAL MEETINGS <br />Informational meetings were held for all streets on November 15th to gather public input <br />on the proposed project from those adjacent to the improvements. Copies of the sign-in <br />sheets and complete meeting minute notes for these meetings are added to this <br />feasibility as Appendix D. <br /> <br /> <br />VII. PROPOSED IMPROVEMENTS <br /> <br />A. JACKSON/OLD C/LAKE SHORE <br /> <br />The road way is proposed to be milled and overlaid along with replacement of <br />badly damaged or very poorly draining curb and gutter. In addition concrete <br />valley gutters will be added on the west side of the road at Australian Avenue <br />and Bluwood Avenue to address poor drainage across the intersection. Only <br />minor structure rehabilitation and repair is anticipated on the sanitary and storm <br />sewer. <br /> <br />B. PARK VIEW COURT <br /> <br />Due to the widespread advanced deterioration of the concrete curb and gutter it <br />is proposed to replace nearly all the curb and gutter. The style of surmountable