My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-15-2021 Council Packet
>
City Council Packets
>
2020-2029
>
2021
>
12-15-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 4:05:46 PM
Creation date
2/9/2022 4:03:42 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Water Rate $3.55 $3.70/1,000 gallons (winter rate) <br />$3.70 $3.85/1,000 gallons (summer rate) <br />Water Service Charge $13.90 $14.30/Quarterly <br />Water Meter Fixed-Network <br />Technology Non- <br />Compliance Surcharge <br />$12.35 $12.75/Quarterly <br />Water Meter Fixed-Network <br />Technology Opt-Out Fee <br />$12.35 $12.75 Quarterly <br /> <br /> <br />Water Meter Cost <br />This is the price charged by the supplier for a new water meter. <br /> <br />PLUMBING PERMIT FEES <br />Water Meter $401.00 $470.00 – ¾” for single family homes <br />1” & > – Current price charged by supplier <br /> <br /> <br />Shed Zoning Permit <br />The previous zoning code required a building permit for all sheds and accessory buildings. The fee <br />for a building permit is based on value plus a plan review fee and state surcharge. Since the <br />Minnesota Building Code only requires a permit for accessory buildings that are 200 square feet or <br />larger, the newly adopted Zoning Code now only requires a zoning permit for sheds or accessory <br />buildings that are under 200 square feet. Staff does still want to review a site plan and do an <br />inspection to make sure the building is meeting the location and setback requirements, so a new <br />zoning permit and fee is being added. <br /> <br />General Construction - Miscellaneous Permit Fees <br />Zoning Permit – Accessory <br />Buildings/Sheds under 200 square <br />feet <br />$50.00 <br /> <br /> <br />Park Facility Rental Fees <br />Staff is proposing a slight fee increase for shelter facility rental fees for Spooner Upper Shelter and <br />Pioneer Park. Additionally, an increase for the lower shelter to accommodate for the larger group sizes <br />with the new shelter that was installed. <br /> <br />Old Fire Hall - Staff is proposing to eliminate the daytime fee for Friday – Sunday and Holiday Rentals <br />since the Old Fire Hall has not been double booked in one day and has caused some confusion with <br />renters. This change would simplify the rental process and eliminate issues with groups staying past <br />their rental times. <br /> <br />Rental Fees – Old Fire Hall <br /> $350 deposit required <br />$100 – Monday - Thursday <br />$100 – 8am-6pm, Friday–Sunday & Holidays <br />$180 – 6pm-12am, Friday–Sunday & Holidays
The URL can be used to link to this page
Your browser does not support the video tag.