My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-11-09 Council Minutes
>
City Council Meeting Minutes
>
2000-2009
>
2009
>
02-11-09 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2009 1:24:29 PM
Creation date
2/18/2009 9:23:10 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES <br />CITY COUNCIL <br />FEBRUARY 11, 2009 <br />also provides that the pylon sign does not have to be brought into <br />compliance at this time and requires that the issue be revisited at the time <br />any future PUD amendment is requested. <br />Mr. Blesener introduced the following resolution and moved its adoption: <br />RESOLUTION NO. 2009-2-36 -APPROVING THE AMENDMENT <br />TO THE GRABA DEVELOPMENT AGREEMENT AS <br />RECOMMENDED BY THE CITYADMINISTRATOR AND <br />AUTHORIZING THE MAYOR AND CITYADMINISTRATOR TO <br />EXECUTE THE AGREEMENT ON BEHALF OF THE CITY <br />The foregoing resolution was duly seconded by Montour. <br />Ayes (4). <br />Nays (0). Resolution declared adopted. <br />COBBLESTONE The City Administrator reported that the City Engineer obtained bids <br />VILLAGE for repair of a storm sewer within the Cobblestone Village property. This <br />STORM repair work involves the replacement of storm sewer pipe by directional <br />SEWER bore. The existing corrugated metal pipe has deteriorated and there is <br /> resulting significant <br />REPAIR erosion. The Administrator explained the history of the storm sewer in <br />PROJECT area, commenting that the City's former engineering firm should have <br /> identified this pipe and required its replacement at the time that the <br /> Cobblestone Village project was developed. <br />The Administrator reviewed the bids received noting the significant <br />difference between the low bid and the other four bids received. This <br />difference has been discussed with the low bidder, who indicated his <br />confidence in the bid calculation as submitted. Therefore, staff is <br />recommending award of the low bid for the cobblestone Storm Repair <br />Project. <br />Mr. Montour introduced the following resolution and moved its adoption: <br />RESOLUTION NO. 2009-2-37 -AWARD OF THE LOW BID FOR <br />THE COBBLESTONE STORM REPAIR PROJECT TO <br />FRATTALONE COMPANIES, INC. IN THE AMOUNT OF $82, 734.50 <br />AS RECOMMENDED BY THE CITY ENGINEER <br />The foregoing resolution was duly seconded by Keis. <br />Ayes (4). <br />Nays (0). Resolution declared adopted. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.