<br />5 New Look Contracting, Inc. $1,246,229.50
<br />6 Bituminous Roadways Inc. $1,264,475.04
<br />7 Park Construction Company $1,421,655.35
<br />8 Forest Lake Contracting, Inc. $1,769,975.50
<br />
<br />The City received competitive bids for the 2024 Street Improvements Project. The low bid from
<br />Miller Excavating, Inc. was 10% lower than the engineer’s estimate.
<br />
<br />The table below identifies the as-bid project costs, itemized by improvement type, with project
<br />contingency and indirect costs included.
<br />
<br />Location
<br />Feasibility
<br />Report
<br />Cost
<br />As-Bid
<br />Cost
<br />5%
<br />Contingency
<br />Indirect
<br />Costs
<br />Engineering,
<br />Geo
<br />Current
<br />Estimated
<br />Total
<br />Project
<br />Cost
<br />Country Drive
<br />Streets (2024-PW43) $701,000 $418,496 $20,925 $109,855 $549,276
<br />Sanitary & Water (2024-PW43) $5,391 $2,785 $139 $731 $3,655
<br />Storm Sewer (2024-Storm 01) $133,515 $183,613 $9,181 $48,198 $240,992
<br />Subtotal – Country Drive $839,906 $604,894 $30,245 $158,785 $793,923
<br />
<br />Jackson Street
<br />Streets (2024-PW42) $328,957 $225,968 $11,298 $59,317 $296,584
<br />Sanitary & Water (2024-PW42) $22,712 $12,303 $615 $3,229 $16,147
<br />Storm Sewer (2024-Storm 11) $61,741 $27,359 $1,368 $7,182 $35,909
<br />Subtotal – Jackson Street $413,410 $265,630 $13,282 $69,728 $348,640
<br />
<br />MNNR Railroad Ditch Cleaning
<br />Drainage Improvements (2024-Storm 10) $102,946 $80,130 $4,006 $21,034 $105,170
<br />Subtotal – MNNR Railroad Ditch Cleaning $102,946 $80,130 $4,006 $21,034 $105,170
<br />
<br />Park Trail Replacement
<br />Thunder Bay Trail Improvements (2024-Parks 29) $24,944 $1,247 $6,548 $32,739
<br />Pioneer Park Trail Improvements (2024-Parks 37) $106,340 $5,317 $27,914 $139,571
<br />Subtotal – Park Trail Replacement $131,284 $6,564 $34,462 $172,310
<br />
<br />Totals – Project $1,356,262 $1,081,938 $54,097 $284,009 $1,420,043