Laserfiche WebLink
<br />5 New Look Contracting, Inc. $1,246,229.50 <br />6 Bituminous Roadways Inc. $1,264,475.04 <br />7 Park Construction Company $1,421,655.35 <br />8 Forest Lake Contracting, Inc. $1,769,975.50 <br /> <br />The City received competitive bids for the 2024 Street Improvements Project. The low bid from <br />Miller Excavating, Inc. was 10% lower than the engineer’s estimate. <br /> <br />The table below identifies the as-bid project costs, itemized by improvement type, with project <br />contingency and indirect costs included. <br /> <br />Location <br />Feasibility <br />Report <br />Cost <br />As-Bid <br />Cost <br />5% <br />Contingency <br />Indirect <br />Costs <br />Engineering, <br />Geo <br />Current <br />Estimated <br />Total <br />Project <br />Cost <br />Country Drive <br />Streets (2024-PW43) $701,000 $418,496 $20,925 $109,855 $549,276 <br />Sanitary & Water (2024-PW43) $5,391 $2,785 $139 $731 $3,655 <br />Storm Sewer (2024-Storm 01) $133,515 $183,613 $9,181 $48,198 $240,992 <br />Subtotal – Country Drive $839,906 $604,894 $30,245 $158,785 $793,923 <br /> <br />Jackson Street <br />Streets (2024-PW42) $328,957 $225,968 $11,298 $59,317 $296,584 <br />Sanitary & Water (2024-PW42) $22,712 $12,303 $615 $3,229 $16,147 <br />Storm Sewer (2024-Storm 11) $61,741 $27,359 $1,368 $7,182 $35,909 <br />Subtotal – Jackson Street $413,410 $265,630 $13,282 $69,728 $348,640 <br /> <br />MNNR Railroad Ditch Cleaning <br />Drainage Improvements (2024-Storm 10) $102,946 $80,130 $4,006 $21,034 $105,170 <br />Subtotal – MNNR Railroad Ditch Cleaning $102,946 $80,130 $4,006 $21,034 $105,170 <br /> <br />Park Trail Replacement <br />Thunder Bay Trail Improvements (2024-Parks 29) $24,944 $1,247 $6,548 $32,739 <br />Pioneer Park Trail Improvements (2024-Parks 37) $106,340 $5,317 $27,914 $139,571 <br />Subtotal – Park Trail Replacement $131,284 $6,564 $34,462 $172,310 <br /> <br />Totals – Project $1,356,262 $1,081,938 $54,097 $284,009 $1,420,043 <br /> <br />