My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-22-09 Council Minutes
>
City Council Meeting Minutes
>
2000-2009
>
2009
>
06-22-09 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2009 1:25:11 PM
Creation date
7/2/2009 1:23:30 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES <br />CITY COUNCIL <br />JUNE 22, 2009 <br />City. The City Planner and Planning Commission recommend approval <br />subject to conditions. <br />Blesener noted that the Final Plat has received a permit from the <br />Watershed District. Blesener asked the plan for the existing tennis court. <br />John Johnson, engineer representing Pinot Properties, reported that this <br />Final Plat is the first of two phases. The timing of the second phase is <br />undetermined at this time. Johnson reported that they have no problem <br />complying with the recommendations, but noted that most of the City <br />F,ngineer's recommendations apply to phase two. <br />Dennis Claridge, Pinot Properties, reported that the shed has been <br />removed. Johnson indicated that they would not remove the tennis court <br />until phase two is developed. He noted that a future property owner may <br />wish to retain the tennis court. <br />Blesener asked about the white pipe ends that are protruding from the <br />ground. Johnson replied that those are sewer service clean-outs for the <br />house on Lot 2. The pipes will be cut flush with the ground. <br />McGraw asked when the ponding shown on future Lot 5 would be <br />developed. Johnson replied that it would be constructed as part of phase <br />two, the development of Lots 3, 4, and 5. Johnson noted that these details <br />would be included in the Development t~greement. <br />Blesener asked if the house on Lot 2 is being remodeled and will be sold. <br />Claridge replied that that was correct. <br />Montour clarified that Lot 2 contains the existing house and Lot 1 will be <br />anew lot fionting on Little Canada Road. The remainder of the property <br />will be an outlot that will be developed into three single-family lots some <br />time in the future..Tohnson replied that that was correct. <br />There was no one present from the general public wishing to comment on <br />this matter. <br />Upon motion by Montour, seconded by Boss, the public hearing was <br />closed. <br />Mr. Montour introduced the following resolution and moved its adoption: <br />RESOLUTION NO. 2009-6-136 -APPROVING THE HUOT <br />ADDITION FINAL PLAT CONSISTING OF TWO SINGLE-FAMILY <br />LOTSAND ONE OUTLOT SUBJECT TO COMPLIANCE WITH THE <br />RECOMMENDATIONS OF THE CITY PLANNER AS OUTLINED IN <br />HIS JUNE 3, 2009 REPORT, THE CITY ENGINEER AS OUTLINED <br />
The URL can be used to link to this page
Your browser does not support the video tag.