My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-25-86 Council Minutes
>
City Council Meeting Minutes
>
1980-1989
>
1986
>
06-25-86 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2009 2:26:17 PM
Creation date
7/31/2009 2:51:13 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r$ilr~urFs <br />c;ty counc;l <br />June 25, 19£36 <br />Second 4dater The City f_ngineer recommended th~t the City participate in the <br />Cannection second emergency wai.er connection with Roseville. The Enginaer <br />ldith reported that the last time the City participated in such a <br />Rosevilie connection, the cit,y had a watermain contractor working in the <br />area and, therefore, ordered the improveinent. However, as there <br />~qenda is no contractor in the area, the C•ngineer recommended that the <br />Item No. 12b City turn the project over to Roseville to handte. <br />The Engineer reported that the cost of the improvement would be <br />shared equally by both cities< <br />f•4s. Nardini introduced the follo4aing resolution and moved its adoption: <br />RESOLUTIOiV ~IQ. f3Fi-6-2fi3 - DECL/~RIMG THFlT THE <br />CITY bIILL COOPFRATE ~,dITFI TNE CITY OF ROSEVII.LE <br />IPI ES7ABLISHTPIG 1? SEC,OND Ff~IERGENCY ~~lATFR COtJNEC7I0P~ <br />f3ETlJEEN Tt9E T4d0 CITIES ~T i_ITTLE CIINADFl ROAO FlND <br />RTC[ STRFET AP1D INFORD1I~C, RbSFVILLE THAT TNEY C~N <br />PROC~GD TO hIf~VE TfiE CONNf_CTIOPd INSTALLED <br />The foregoing resolution was dul,y seconded by f~1r. Collova. <br />Ayes (4) Nardini, Collova, Fahey, Sca1ae. <br />Nays (0). <br />Resolution declared aciopted. <br />This resolution appears in Resolution Boo'~c Mo. 15, Paae 264. <br />Gardner h1r. Jim Gardner of Garclner Bros. Construction appeared before the <br />Dros. Council requesting approval of a conditional use permit for retail <br />CUP ~or sales and outdoor storage in order to develop a 20,000 square foot <br />Retail Sales office/warehouse building on Centerville Road. <br />& Outdoor <br />Storage Fahey pointed out that the Plannin,ry Commission recommended approval <br />of the CUP and proposed mini-4aarehousing on the back portion of the <br />Anenda property. The Planner recornmended anproval aaith some modifications <br />Item No. 5 to the plan. <br />Gardner explained that his firm constructs single-family homes <br />as s~aell as having a small real estate compan.y and other building- <br />related companies. About £i,000 square feet of the building u>>ould <br />be used for office and the remaining 12,000 square feet ticould be <br />used for warehouse. <br />Gardner explained that the propert,y is difficult to work Evith as <br />there are NSP easements all over it. <br />Gardner reported that a preliminary concept for developing the <br />back portion of the property ~aould be mini-warehousing, which <br />would be sold individually to various tenants. Original1,y, <br />mini-storaye was proposed, ho~•~ever, MSP is opposed to this as <br />they could not control ~~~hat would be stored in the mini-storages. <br />Also, ~JSP a~ants ~~hatever bu~ldings qo up in this area to be <br />sprin'~clered. <br />Page -6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.