My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-27-87 Council Minutes
>
City Council Meeting Minutes
>
1980-1989
>
1987
>
05-27-87 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2009 2:35:31 PM
Creation date
7/31/2009 2:51:38 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PIINUTES <br />City Council <br />P9ay 27, 1987 <br />Copier The City Clerk disagreed that an error was made in calculating the <br />(Cont.) bids and reported that he has signed a contract with D. C. Hey Co. and the <br /> equipment will be delivered tomorrow. <br />There was no one from the Council who made a motion for reconsideration <br />of the purchase of the Sharp copy machine from D. C. Hey Company. <br />Assessment The City Engineer reported that the assessment reapportionment for <br />Reappor- Division No. DL 060696 was routine and recommended approval. <br />tionment <br />Div. No. Mr. Fahey introduced the following resolution and moved its adoption: <br />DL 060696 <br />RESOLUTION N0. 87-5-238 - APPROVING THE <br />Agenda ASSESSPIENT REAPPORTIONMENT FOR DIVISION <br />Item No. 16 N0. DL 060696 AS RECOMMENDED BY THE CITY <br />ENGINEER <br />The foregoing resolution ~~uas duly seconded by Mrs. Scalze. <br />Ayes (5) Fahey, Scalze, Collova, LaValle, Blesener. <br />Nays (0). <br />Resolution declared adopted. <br />This resolution appears in Resolution Book No. 17, Page 257. <br />Feasibility The City Engineer submitted a feasibility report on Improvement No. <br />Report 87-8, the improvement of Centerville Road from Allan Avenue to <br />Imp. No. DeSoto by sanitary sewer and watermain. Estimated cost of the <br />87-8 improvement is $187,237. The Engineer proposed that assessments <br /> for the improvement be determined on a per acre basis rather than <br />Aqenda a per front foot basis. <br />Ttem No. 17 <br /> The City Clerk reported that Larry Lee is proposing to locate the <br /> Slumberland building 40 feet further south than what was originally <br /> proposed. <br /> Blesener asked if sewer would be better located through the middle <br /> of the property. <br /> The Engineer pointed out that the City does not know how the <br /> property will develop, and this is the reason sewer and water is <br /> proposed along Centerville Road. <br />Mrs. Scalze introduced the following resolution and moved its adoption: <br />RESOLUTI0~1 N0. 87-5-239 - APPROVING AP1D <br />ACCEPTING TNE FEASIliILITY REPORT SUBP4ITTED <br />BY THE CITY ENGINEER FOR IP•9PROVEMENT N0. <br />87-8, THE IPIPROVEMENT OF CEPITERVILLE ROAD <br />FROM ALLAN TO DESOTO BY SANITARY SEWER AND <br />Page -29- <br />
The URL can be used to link to this page
Your browser does not support the video tag.