My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-13-88 Council Minutes
>
City Council Meeting Minutes
>
1980-1989
>
1988
>
04-13-88 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2009 2:42:47 PM
Creation date
7/31/2009 2:52:03 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MIPIUTES <br />City Council <br />April 13, 1988 <br />Assessment The City Engineer submitted for approval assessment reapportionment for <br />Reappor- Division No. 061361. <br />tionment <br />Div. No. Mr. Blesener introduced the following resolution and moved its adoption: <br />061361 <br />RESOlUTION N0. 88-4-133 - APPROVING THE <br />Agenda ASSESSMENT REAPPORTIONP^ENT FOR DIVISION <br />Item Pdo. 10 ~10. 061361, A.UD. 1814, 1886 AND 5361 AS <br />SUftMIT1ED BY THE CITY EMGINEER <br />The foregoing resolution was duly seconded by P4r. LaValle. <br />Ayes (5) Blesener, LaValle, Fahey, Scalze, Collova. <br />Nays (0). <br />Resolution declar•ed adopted. <br />This resolution appears in Resolution 13ook No. 19, Page 137. <br />Savage Lake The City Engineer• pr•esented plans for~ a stor•m sewer~ impr•ovement in the <br />R~ Demont Savage Lake and Demont area which he described to the Council. <br />Agenda Blesener• pointed out that the installation of this stor~m sewer~ will <br />Item No. lla make more land available for parks givincl access to additional property. <br />Blesener asked if this would be preferable to the Park Commission or~ <br />i f the Par•k Commi ssi on woul d 1 i ke to see mor•e open water~ ar•ea. <br />Scalze replied that she will brinq the matter up to the Park Commission. <br />The City Engineer~ estimated the cost of the stor~m sewer• addition at <br />$50,000 and pointed out that the improvement would be a change-order <br />to the Demont pr~oject. <br />Payne The City Engineer• r•epor~ted that he has looked at the condition of Payne <br />Avenue Avenue and has two repair estimates. The first would include improving <br />the nor~ther~n por•tion of the r•oad fr•om Allen nor•th to County Road D. <br />Agenda Estimated cost would be appr~oximately $12Q,000 and the impr•ovement would <br />Item No. llb include the r~econstr~uction of the str~eet with installation of a fabr~ic <br />mater~ial as well as fr•ench dr•ains. The second estimate involves Payne <br />Avenue fr•om LaBor•e to County Road D. Estimated cost is $220,000 and <br />involves the same type of impr•ovements. <br />Council and the Engineer• discussetl the cause of the deter•ior•ation of <br />Payne Avenue with the Engineer• pointing out that for~ some time Payne <br />Avenue was the only access to the area being developed adjacent and <br />ther~e has been a gr~eat deal of heavy constr~uction equipment tr•affic <br />on that str•eet. <br />The Engineer• indicated that it may be possible to use stor•m sewer• funds <br />for• the cost of the fr~ench piping that is beinq pr•oposed for~ Payne Avenue. <br />Page -13- <br />
The URL can be used to link to this page
Your browser does not support the video tag.