Laserfiche WebLink
MIPdUTES <br />City Council <br />May 11, 1988 <br />Ger•vai s Fa.hey r~evi ewed the r•epor•t submi tted by the Ci ty Engi neer• for~ pr•ovi di ng <br />Over•look sewer• and water~main improvement to the Ger•vais Overlook Addition located <br />Addition in Maplewood. <br />Scalze stated that she was of the impr•ession that the City would r~un <br />sewer• and water~ to the edge of this pr~operty, and the developer~ would <br />extend the utilities into the site. Scalze noted that the City has <br />never~ extended utilities into other~ developments located in adjacent <br />cities. <br />Scalze stated that she was of the impressionthat a calculation of the <br />water• connection charge would be made similar to what the City did <br />when pr•oviding water• to Cub Foods. <br />The City Cler•k noted that if Car•la Lane wants water~ it will have to <br />come fr~om the City of Maplewood. <br />Fahey replied that this was a separ•ate situation and when and if Carla <br />Lane wants water~, the r~esidents will have to look at the var•ious costs <br />involved to deter•mine if it is financially feasible. <br />The City Clerk repor•ted that ther•e is a petition for• water•main impr~ovement <br />for~ Edger•ton Str•eet and that ther•e is ver•y little footage left in the <br />City to assess such impr•ovements over•. <br />Fahey stated that the City cannot change its policies mid-str•eam and <br />felt that the Ger•vais Over•look Addition would have to be tr•eated in <br />the same manner• as Cub Foods. <br />The City Cler•k r~epor~ted that Maplewood would be willing to assess the <br />impr•ovement, however•, noted that the City does not have the valuation <br />of the property and pointed out that the valuation system is curr•ently <br />being changed. <br />The City Engineer stated that he thought the City Auditor~ would calculate <br />the connection char•ges. <br />Scalze felt that it was not in the best inter•ests of the City to <br />build water~main in Maplewood and stated that she would need to be <br />convinced to extend water• past the Maplewood line. <br />Ken Gust, engi neer~ r•epr~esenti ng Don Nel son, the owner~ of the pr•oper~ty, <br />r•epor~ted that ther•e is sanitar•y sewer~ to the manhole at the edge <br />of the pr•oper~ty. Gust repor•ted that Mr. Nelson would extend the <br />utilities from the edge of the pr~oper•ty line. <br />Gust stated that they would like to know what the City policy is for• <br />providing water• to pr•oper•ties located outside the City as well as the <br />costs involved. <br />Fahey pointed out that utilities would have to be put in to City <br />specifications. <br />Page -8- <br />