Laserfiche WebLink
MINUTES <br />City Council <br />July 13, 1988 <br />Car•1 a Lane The Ci ty Engi neer~ repor•ted that he per~sonal ly pr•eferred Ci ty water and <br />Improvement City water was pr•efer•able fr•om a fir~e pr~otection standpoint, however•, <br />(Cont.) it was pointed out that the City has never~ forced City water• on r~esidents <br />who did not want it. <br />Scalze pointed out that water• lines would have to be run down Keller• <br />Parkway to get to Pa1m Cour•t and also down Ar~cade Str~eet to get to the <br />Maplewood pr~oper•ty, and someone would have to pay for• the cost of these <br />sections of water•main. <br />Fahey stated that he did not feel City tax dollars should be spent to <br />br•ing watermain to Car•la Lane, and if Carla Lane r•esidents want water•main, <br />they will have to pay the cost of getting the water•main to their• street. <br />Fahey suggested the possibility of installing dr~y water•mains under• Carla <br />Lane until such time as water• is available. <br />Olson pointed out that it could be several years before water•main is <br />br•ought to Car~l a Lane. <br />Ellington, Carla Lane, asked if Car•la Lane was put in as a temporary or <br />per~manent r•oad. <br />The City Engineer~ repor•ted that when Carla Lane was constr•ucted it <br />was not constructed to City standar~ds as it was put in as a pr~ivate <br />drive. <br />P1r•. Fahey introduced the following r~esolution and moved its adoption: <br />RESOLUTION N0. 88-7-272 - CALLING FOR A PUBLIC <br />HEARING ON AUGUST 10, 1988 TO CONSIDER THE <br />IMPROVEMENT OF CARI.A LANE BY STREET, CURB AND <br />GUTTER AND WATERMAIN <br />The for•egoing resolution was duly seconded by Mrs. Scalze. <br />Ayes (5) Fahey, Scalze, Collova, LaValle, Blesener. <br />Nays (0). <br />Resolution declar•ed adopted. <br />This r~esolution appear•s in Resolution Book No. 20, Page 277. <br />Mr•. Ol son asked for~ a status r•epor~t on the other~ i ssues r•ai sed by Car•1 a <br />Lane r•esidents at the last Council meeting. <br />Blesener~ r•epor•ted that according to the City's street lighting policy, <br />another• str•eet light could be installed on Car•la Lane, however~, Public <br />Works r~ecommended holding off on the installation until the str•eet <br />impr•ovement status is determined. <br />Blesener• also r~eported that the Building Inspector• has contacted the <br />Page -12- <br />