Laserfiche WebLink
MINUTES <br />City Council <br />August 24, 1988 <br />Imp. No. The City Engineer• r•eported that the estimated cost of the impr~ovement <br />88-19 is $14,300, and the cost would be assessed on an acr•eage basis. <br />(Cont.) <br />Scalze asked if the assessment took into consideration acreage with <br />imper•vious surface versus gr•ass. <br />The City Engineer repor~ted that there was only about a 5% differ~ence <br />between the imper~vious sur•face of the tr•ailer park and the roof tops <br />and driveways of the single-family homes. <br />Jim Villeaux, Terrace Heights Tr~ailer~ Park, asked if this storm sewer <br />impr~ovement was being assessed in the same fashion as other• stor•m sewer <br />improvements in the City. <br />Fahey replied that it was,pointing out the case of the Sleepy Nollow <br />stor•m sewer~ impr~ovement which was paid for by contr•ibuting pr•oper~ties <br />after the pr•oper~ty owner•s entered into an agreement to pay the cost of <br />the improvement. <br />The City Engineer• pointed out that in most cases stor~m sewer• impr•ovements <br />are assessed along with str•eet improvements. However~, ther~e is no str~eet <br />impr•ovement in this case. The Engineer• also pointed out that the City is <br />proposing to assess a por•tion of the cost of the impr~ovement to the School <br />District. <br />Ther•e was no one else pr~esent wishing to comment on this matter~. <br />Mr•. Blesener~ introduced the following resolution and moved its adoption: <br />RESOLUTION N0. 88-8-341 - CLOSING THE PUBLIC <br />HEARING ON IMPROVEMENT N0. 88-19, IMPROVEMENT <br />OF SYLVAN AND DAY STREETS BY STORM SEWER <br />The foregoing r•esolution was duly seconded by Mr. LaValle. <br />Ayes (5) Blesener, LaValle, Scalze, Collova, Fahey. <br />Nays (0). <br />Resolution declared adopted. <br />This resolution appears in Resolution Book No. 20, Page 347. <br />Mr•. Collova intr•oduced the following resolution and moved its adoption: <br />RESOLUTION N0. 88-8-342 - ORDERING IMPROVEMENT <br />N0. 88-19 AS PROPpSE~BY THE CITY ENGINEER WHICH <br />CALLS FOR THE IMPROVEMENT OF SYLVAN AND DAY STREETS <br />BY STORM SEWER AT AN ESTIMATED COST OF $14,300 <br />The for•egoing resolution was duly seconded by Mr. Blesener. <br />Ayes (5) Collova, Blesener, Fahey, LaValle, Scalze. <br />Nays (0). <br />Resolution declar~ed adopted. <br />This resolution appears in Resolution Book No. 20, Page 348. <br />Page -2- <br />