have to be solved because of the sidewalk, and the successful connection of the 4-3 project <br />to the western roundabout being planned at Little Canada Road, County Road C, and <br />Lakeshore Avenue. <br />Sanitary Sewer Lining Project – More lining was completed in 2024 that will be partially <br />reimbursed by grant funds from the Metropolitan Council. Portions of sewer main on Little <br />Canada Road, Rice Street, all of Iona Lane, and the main in the easement running north <br />from County Road C to Little Canada Road were successfully lined using a water cure that <br />increased the finished quality of the work and the good work done by the contractor along <br />with the preparation done by the lining team at Bolton & Menk substantially reduced the <br />amount of calls received about the project. A number of manholes, including all of the <br />manholes on Carla Lane, were sealed up as part of the project to prevent infiltration into <br />the sewer system. <br />Recap of 2024 Parks Projects <br />Spooner Park Pickleball Conversion and Parks Court Resurfacing – Additional pickleball <br />courts were necessary in our community due to increasing demand for pickleball <br />opportunities. Two multiuse courts at Spooner Park were converted to six exclusive <br />pickleball courts. Since their inception, these courts have received heavy use from the <br />community. In addition to this project, the two multi-use courts at Pioneer Park were lined <br />for exclusive Tennis use to ensure these players weren’t being displaced. The basketball <br />court at Thunder Bay Park and Rondeau Park were also resurfaced. <br />Thunder Bay Trail Connection & Trail Repair – A trail connection was made from Payne <br />Ave to the Pioneer Commons Development along the Thunder Bay Linear Trail. This <br />connection enhances connectivity in the Northeast region of the city. Additionally, around <br />3000 linear feet of trail was repaired in 2024. Trails were inspected in 2021 and assigned <br />replacement dates after reviewing the condition of all trails. <br />Pioneer Park Trail Repair – 2700 linear feet of trail was repaired in Pioneer Park. Trails <br />were inspected in 2021 and assigned replacement dates after reviewing the condition of all <br />trails. <br />Completion of Pioneer Park Play Node & Water Feature – Final punch list items were <br />completed on the play node at Pioneer Park. Staff is pursuing alternative water feature <br />discharge options in 2025 to increase the sustainability of the park. <br />Waterworks Trail Bench Installation – The City was awarded the Be Active Be Green <br />Bench Grant in 2024 to provide benches for areas of our parks system that did not have <br />them already. Having benches within closer distances of each other can provide those with <br />less mobility options for taking breaks during their walks. City Maintenance Staff installed <br />ten of these benches along the water works trail and three benches along the Jackson Street <br />trail just north of Demont Ave. <br />Recap of 2024 Building Projects: <br />City Hall Basement Waterproofing – A contractor installed drain tile around the inside <br />perimeter of the basement. The project was a huge success and kept the basement dry <br />throughout the incredibly wet spring and summer. <br />City Hall Windows – The windows on the north side of the building were replaced. The <br />new windows brought a nice clean look and shored up some water intrusion issues that had <br />cropped up over the years. <br />City Hall Solar – Staff applied for and received grant funds for a solar project that will take <br />place in 2025.