Laserfiche WebLink
MINUTES <br />CITY COUNCIL <br />October 25, 1989 <br />The City Engineer reported that it is necessary to run <br />watermain from Rice Street between the two commercial <br />buildings to serve the residential area that will be <br />developed to the east. The Engineer stated that this <br />is the time to run the watermain to the residential <br />property, before the parking lot of the commercial <br />center is blacktopped. The Engineer recommended that <br />the City have the waterline run at this time and pay <br />for the cost from the General Fund. when bonds are <br />issued for the residential road project, the General <br />Fund could be reimbursed at that time. Estimated cost <br />is between $7,500 and $8,500. <br />The City Engineer pointed out that the cost is less <br />than $10,000, therefore, informal bids can be taken for <br />the improvement. <br />Mr. Fahey introduced the following resolution and moved <br />its adoption: <br />RESOLUTION N0. 89-10-521 - AUTAORIZING THE CITY <br />ENGINEER TO PROCEED WITH THE INSTALLATION OF WATERMAIN <br />FOR TAE BOOSALIS RESIDENTIAL PROJECT AND APPROVING <br />INTERIM FINANCING OF THE IMPROVEMENT FROM THE GENERAL <br />FUND OR SEWER AND WATER FUND PENDING BONDING FOR THE <br />RESIDENTIAL ROAD PROJECT AT WAICH TIME THE GENERAL FUND <br />OR SEWER AND WATER FUND WOULD BE REIMBURSED <br />The foregoing resolution was duly seconded by Blesener. <br />Ayes (5) Fahey, Blesener, Scalze, LaValle, Collova. <br />Nays (O). <br />Resolution declared adopted. <br />Fahey reported that the drainage for the project has <br />not been finalized at this time, and the Council has <br />had some discussion as to whether or not it is <br />appropriate for the people on Iona Lane to contribute <br />to the drainage improvement since it appears the water <br />from Iona Lane dumps into this area. Fahey reported <br />that when a final recommendation on drainage is made, <br />there will be a meeting to review it and the Iona Lane <br />residents will be invited to that meeting. <br />The City Attorney recommended that the Comprehensive <br />Plan be amended to reflect the zoning change enacted by <br />the City this evening. <br />Page 18 <br />