Laserfiche WebLink
MINUTES <br />CITY COUNCIL <br />May 9, 1990 <br />Scalze felt that the Planning Commission should review <br />the matter and make a recommendation. <br />Frattalone requested that should the City decide not to <br />permit this use, that he be given a timeframe for <br />phasing out the operation. Frattalone estimated that <br />it would take him a year to phase it out. Frattalone <br />also stated that if the City's concern has to do with <br />the watermain, he would be willing to post a bond for <br />the watermain. Frattalone requested that he be allowed <br />to continue the operation until the Council makes a <br />final decision, pointing that he is under contract for <br />disposal of bituminous materials. <br />Scalze asked about the effect of the operation on Ryan <br />Drive. <br />The City Engineer reported that Ryan Drive was <br />constructed on peat material and was never intended to <br />be a high-use roadway. The Engineer felt the bubbling <br />of Ryan Drive was caused as much by the traffic over <br />the road as anything else. <br />Fahey suggested that Frattalone be limited to hauling <br />in only that material for which he is under contract <br />until a final decision is made, and suggested that <br />Frattalone provide the City with copies of his <br />contracts. Fahey also suggested that Frattalone be <br />required to post a bond for the watermain. Fahey felt <br />that if the City decides not to permit this use, that <br />Frattalone should be given a reasonable amount of time <br />to relocate. <br />Frattalone stated that relocation would take at least a <br />year since he would have to find another site. <br />Scalze asked the size of Frattalone's contracts. <br />Frattalone replied that he was under contract for <br />30,000 to 35,000 cubic yards. <br />Blesener stated that the Council is not looking at <br />shutting down the operation tomorrow, but rather at the <br />long-term solution. <br />Frattalone stated that he would like to continue his <br />recycling operation, and indicated that he thought the <br />worst case would be that the City would limit the <br />operation to only a few years. <br />Page 10 <br />