My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-08-90 Council Minutes
>
City Council Meeting Minutes
>
1990-1999
>
1990
>
08-08-90 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2009 3:03:09 PM
Creation date
7/31/2009 2:53:33 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES <br />CITY COUNCIL <br />AUGUST 8, 1990 <br />It was suggested that the watermain easement go to the <br />west of the oak tree rather than the east. <br />The City Engineer replied that this may have a greater <br />impact on the western property, than running the <br />watermain on the eastern side of the tree. However, <br />this will be looked at. <br />Mr. Heinel asked if DeSoto were improved, if the <br />industrial park would be required to pay a portion of <br />the cost of the street improvement. <br />Fahey pointed out that the industrial park could not be <br />assessed for the street if the businesses were not <br />allowed to use it. Fahey felt that Mr. Heinel's <br />earlier statement was correct that the residential <br />property on the east side of DeSoto will have to <br />develop differently. <br />There was no one else wishing to comment on this <br />matter. <br />Upon motion by Blesener, seconded by LaValle, the <br />public hearing was closed. <br />Mr. Blesener introduced the following resolution and <br />moved its adoption: <br />RESOLUTION NO. 90-8-367 - ORDERING IMPROVEMENT NO. <br />90-10, IMPROVEMENT OF DESOTO AVENUE LYING NORTH OF <br />ALLEN AVENUE AND EXTENDING TO THE SOUTHEAST CORNER OF <br />THE SLUMBERLAND PROPERTY BY INSTALLATION OF WATERMAIN <br />AND APPURTENANCES AND AUTHORIZING THE CITY ENGINEER TO <br />PREPARE PLANS AND SPECIFICATIONS FOR SUCH IMPROVEMENT <br />CONTINGENT ON SLUMBERLAND'S AGREEMENT TO PAY THE TOTAL <br />COST OF SAID IMPROVEMENT WITH THE STIPULATION THAT IF <br />TAE LOWER THREE LOTS ALONG THE EAST SIDE OF DESOTO WANT <br />TO CONNECT TO THE WATERMAIN IMPROVEMENT THAT THEY <br />REIMBURSE SLUMBERLAND FOR THEIR FAIR SHARE OF THE <br />IMPROVEMENT COSTS, AND WITH THE CONDITION THAT THE <br />ATTEMPTS BE MADE TO LOCATE THE WATERMAIN ON THE EAST OR <br />WEST SIDE OF THE EXISTING OAK TREE LYING WITHIN THE <br />ROAD RIGHT-OF-WAY <br />The foregoing resolution was duly seconded by Fahey. <br />Ayes (5) Blesener, Fahey, Collova, LaValle, Scalze. <br />Nays (0). <br />Resolution declared adopted. <br />Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.