Laserfiche WebLink
MINUTES <br />CITY COUNCIL <br />AUGUST 14, 1991 <br />The City Administrator reported that the watermain is a <br />municipal main. Water service was needed for the <br />Stanke building to service a sprinkler system that was <br />necessary in order that an occupancy permit could be <br />issued for the building. The Administrator pointed out <br />that any watermain that is in public right-of-way is <br />available for public use. <br />Mr. Blesener introduced the following resolution and <br />moved its adoption: <br />RESOLUTION NO. 91-8-271 - AUTHORIZING PUBLIC WORKS TO <br />FILL POT HOLES ON RYAN DRIVE, RYAN LANE AND SPRUCE <br />STREET KEEPING TRACK OF THE COSTS <br />The foregoing resolution was duly seconded by LaValle. <br />Ayes (5) Blesener, LaValle, Scalze, Collova, Hanson. <br />Nays (0). <br />Resolution declared adopted. <br />Blesener pointed out that the maintenance that is <br />necessary on the section of Spruce Street that has been <br />accepted by the City, is a normal street maintenance <br />issue that needs to be addressed. <br />Mr. LaValle introduced the following resolution and <br />moved its adoption: <br />RESOLUTION N0. 91-8-272 - ORDERING A FEASIBILITY REPORT <br />FOR THE IMPROVEMENT OF STREETS IN RYAN INDUSTRIAL PARK <br />AS PETITIONED FOR BY THE MAJORITY OF PROPERTY OWNERS IN <br />THE PARK, TAAT REPORT TO INCLUDE RYAN DRIVE, RYAN LANE <br />AND SPRUCE STREET, WITH COST OF THE REPORT NOT TO <br />EXCEED $2,000 <br />The foregoing resolution was duly seconded by Blesener. <br />Ayes (5) LaValle, Blesener, Collova, Hanson, Scalze. <br />Nays (o). <br />Resolution declared adopted. <br />The City Engineer pointed out that he would put <br />together a cost estimate for storm drainage work <br />necessary at Spruce Street and South Owasso Blvd. as a <br />separate item. <br />A property owner asked the timeframe for filling pot <br />holes in the Park. <br />The City Administrator replied that sealcoating work <br />will begin shortly on other City streets. Ryan <br />Industrial Park will be a top priority item after <br />sealcoating. The Administrator estimated that the work <br />would be completed within a month. <br />Page 13 <br />