Laserfiche WebLink
MINUTES <br />CITY COUNCIL <br />JUNE 7, 1994 <br />necessary. <br />The Engineer replied that at this point plans and specs <br />show a 5-foot sidewalk adjacent to the curb and an 8- <br />foot trail along Jackson Street. <br />Scalze suggested that the Park & Recreation Commission <br />be made aware of the fact that the Council will be <br />discussing the sidewalk/trail issue at.its June 22nd <br />meeting. <br />The City Administrator again pointed out the goal to <br />have Council consider bids at its July 13th meeting so <br />that the 1994 Street Improvement Projects have an <br />opportunity to be completed before school begins. <br />Mr. LaValle introduced the following resolution and <br />moved its adoption: <br />RESOLUTION NO. 94-6-141 - ACCEPTING PLANS AND <br />SPECIFICATIONS FOR THE 1994 STREET IMPROVEMENT PROJECTS <br />AND AUTHORIZING THE CITY ENGINEER TO ADVERTISE FOR BIDS <br />FOR THESE IMPROVEMENTS <br />The foregoing resolution was duly seconded by Scalze. <br />Ayes (5) LaValle, Scalze, Hanson, Morelan, Pedersen. <br />Nays (0). Resolution declared adopted. <br />FIRE TRUCK The City Administrator reported that the Little Canada <br />BIDS Fire Department has received two bids £or the purchase <br />of a new fire truck. It appears the Fire Department <br />will indicate they prefer the Pierce equipment for a <br />number of reasons. The Administrator reported that the <br />Fire Chief had some discussions with other departments <br />at the recent State Fire School on the limited number <br />of bids being received by various departments, and it <br />was indicated that typically only one bid is received <br />if the equipment specs are tied too closely to a <br />specific manufacturer. <br />The Administrator pointed out that the two bids are <br />very close. If the Pierce equipment is preferred, <br />based on the discount quoted, the Administrator <br />recommended that payment for the fire truck be made up <br />front. If the General equipment is preferred, it may <br />be preferable to pay for the truck upon delivery. The <br />two bids will be reviewed by the Fire Truck Committee, <br />5 <br />