My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-27-96 Council Minutes
>
City Council Meeting Minutes
>
1990-1999
>
1996
>
03-27-96 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2009 4:47:10 PM
Creation date
7/31/2009 2:57:28 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES <br />CITY COUNCIL <br />MARCH 27, 1996 <br />Finsness reviewed the renovation work planned for the <br />old fire station. When Finsness pointed out that the <br />estimate includes work to fire rate the stairway, <br />Council stated it was their understanding that the <br />stairway had to be removed. Finsness reported that in <br />discussing this with the Building Official in more <br />detail, since the occupancy of the upper level of the <br />building will change, the stairway can remain. <br />Morelan asked if analysis had been done to identify <br />areas where modifications are needed in the building~s <br />sprinkler system as a result of the renovations. <br />Finsness reported that this sort of analysis will occur <br />in the next phase of the project. <br />Morelan asked if the cost estimate included <br />architectural fees. Finsness replied that they did <br />not, but felt total project costs would come in under <br />budget. <br />Mr. Morelan introduced the following resolution and <br />moved its adoption: <br />RESOLUTION N0. 96-3-74 - APPROVING RENOVATION PLANS FOR <br />TI-IE OLD FIRE STATION AS SUBMITTED BY PAUL FINSNESS <br />ARCHITECTS <br />The foregoing resolution was duly seconded by Scalze. <br />Ayes (4) Morelan, Scalze, Pedersen, Fahey. <br />Nays (0). Resolution declared adopted. <br />The City Administrator reported that the largest cost <br />item in the renovation is roof replacement. This work <br />has been set up to be outside the scope of the contract <br />in order to allow roofing contractors to bid this work <br />independent of the other renovation work. <br />Morelan asked if the work scope included parking <br />improvements. <br />Finsness replied that the only parking improvements <br />would be two handicapped accessible spots at the lower <br />level of the building. The area will be restriped to <br />provide for these parking spots and the proper signs <br />will be installed. There is some bituminous work <br />included in the work scope to create a walkway from the <br />two parking stalls to the new entrance area. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.