My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-26-97 Council Minutes
>
City Council Meeting Minutes
>
1990-1999
>
1997
>
03-26-97 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2009 4:54:33 PM
Creation date
7/31/2009 2:58:03 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES <br />CITY COUNCIL <br />MARCH 26, 1997 <br />Morelan stated if the property owner can prove that the system is <br />operating properly on an annual basis, and there is no need to repair or <br />replace the system, he would support allowing its continued use. <br />Mr. Morelan introduced the following resolution and moved its adoption: <br />RESOI, UTION N0. 9 7-3- 73 - APPROVING AN EXEMPTION FROM <br />THE CITY CODE REQUIRING 7HE CONNECTION TO SANITARY <br />.SEWER FOR THE PROPERTY I,OCATED AT 249 DEMONT <br />AVENZIE SU13.IECT TO THE REQUIREMENT OFANNUAL <br />IN.SPECTIONS INDICATING COMPI,IANCE WITH b'TATE <br />REGUI,ATIONS PE127AINING TO S'EPTIC SYSTEMS, AND <br />INDICATING THAT AT TFIE TIME REPAIRb' OR REPI.ACBMENT <br />OF THE SEPTIC SY.STEM IS NECES.SARY, THB PROPERTY <br />WOUI I) ]3E REQUIRED TO CONNECT TO.SANITARYSEWER <br />WITH THE COUNCII. NOTING THAT TFIE 13ASI.S FOR TFIIS <br />EXEMPTION I.S THAT TFIERE IS NO SANITf1 RY SEWER <br />AVAII.A73I.E TO THIS PROPEIZTYAT THI,S TIME <br />The fore~oing resolution was duly seconded by L~Valle. <br />Ayes (2) Morelan, LaValle. <br />Nays (1) Scalze. Resolution declared adopted. <br />SPOON~R PARK The Building Official submitted quotations for construction of the <br />PICNIC SH~LT~R Spooner Park picnic shelter. It was noted that all individual quotations <br />are under $25,000, with the total project amount at $130,979.OQ This is <br />below the o~~iginal bid amount of $154,100. The City Administrator <br />indicated that the addition of the arcl~itect's fee and the construction <br />management fee brings the bid total to approximately $143,000.00. <br />The Administrltor reported that to date the City h1s a budget of $135,000 <br />for the project, $60,000 of that amounY from donations. The AdministraYOr <br />indicated there may be the opportunity for additional donations to make up <br />tlte estimated $8,000 in deficit. <br />Morelan pointed out that final gradin~ and landscaping will be done by <br />City staff, as was anticipated in the original bid. Morelan asked the <br />timetable for project completion. <br />The Building Official estimated that the project would be completed eady <br />June. <br />LaValle asked if there were dollars available fi-om the State for cappin~ <br />the well in the park. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.