Laserfiche WebLink
MINUTES <br />CITY COUNCIL <br />NOVEMBER 12, 1997 <br />Scalze pointed out that the shelter holds 80 to 90 people and she <br />questioned whether 30 parking spaces were adequate. Morelan asked <br />what the City's Code would be for parking. <br />The Administrator reported that Code would require approximately 192 <br />parking spaces for Spooner Park. There are over 200 parking spaces if the <br />school parking lot is included. The Administrator felt that a shared <br />parking lot usage was reasonable for the Park. <br />Fahey su~~ested that perhaps the Council and Parks & Recreation <br />Commission should visit the Spooner Park shelter and look at the parking <br />situation. Fahey suggested that another solution might be to have angle <br />parking off Eli Road rather than impact the green area of the park. <br />Morelan questioned the parking expansion proposed for Gervais Mill <br />Park. The Director reported that it is proposed that the parking area off <br />Edgerton Road be defined and surfaced with gravel. This material could <br />be used later on when the parking lot is blacktopped. <br />Scalze asked about the $20,000 budgeted for backstops in Spooner Park. <br />The Director reported that this includes replacing the fabric and some <br />posts on each of the five backstops. <br />The Administrator reviewed the Public Works portion of the CIP Budget <br />that includes replacement of the 1985 4-wheel drive truck, paving the <br />Public Works parkin~ lot, as well as some miscellaneous expenditures. <br />The Water/Sewer Capital Replacement Budget was reviewed with <br />discussion focusing on the inflow/infiltration study proposed to be <br />completed in 1998 as well as resulting repairs to the City's sewer system. <br />Morelan indicated that he would like to see a payback schedule for this <br />expenditure. The City Administrator reported that the City will be trying <br />to identify and immediately repair leaks that have a 6 to 7 year payback. <br />A detailed feasibility report has not been done at this point. The <br />Administrator pointed out that the City needs to get the televising done, <br />the sewer repairs done, and sump pumps checked. <br />The Administrator also pointed out that the budget includes a proposal is <br />to purchase a third pump for the booster station. The pumps in the station <br />are getting older and if one goes down, one pump will not be able to keep <br />up during high water demand times This past summer during the dry <br />period, the booster station was experiencing low level alarms <br />approximately 15 minutes before the pumps were scheduled to ~o on. The <br />City is on an off-peak rate schedule with NSP that allows pumping <br />