My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-10-99 Council Special Minutes
>
City Council Meeting Minutes
>
1990-1999
>
1999
>
02-10-99 Council Special Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2009 5:07:38 PM
Creation date
7/31/2009 2:58:46 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES <br />CITY COUNCIL <br />FEBRUARY 10, 1999 <br />Nardini asked about the location of the bike path. The <br />Administrator pointed out that there will not be a designated bike <br />path. Rather the street will be widened to 32 feet that will provide <br />additional area for bike and pedestrian traffic. The additional <br />street width will come from each side of the street. <br />Nardini indicated that the property owners would like to see these <br />details. Fahey noted that the City will not spend money preparing <br />plans and specifications until the improvement is ordered. <br />The Administrator noted that the cold-in-place recycling project <br />planned by the County is a maintenance project, therefore, it is <br />field designed and no plans and specs are prepared. The City, <br />however, has complicated the County's project by proposing <br />concrete curb and ~utter rather than the bituminous planned by the <br />County. There will be plans and specs prepared for the curb and <br />gutter as well as the drainage improvements planned by the <br />Watershed. The Administrator estimated that plans and specs <br />would be ready in a week to 10 days and, at that time, property <br />owners wil( be invited to review them. If upon reviewing the plans <br />and specs, property owners have concerns, the plans and specs <br />could be modified. <br />Nardini stated that property owners want to know where the street <br />is being widened. <br />Fahey replied that the City cannot determine this exactly at this <br />point, buY it is planned that the additional width will come from <br />both sides of the street. However, as the road improvement occurs, <br />location can be adjusted to avoid trees. It was noted that the street <br />width currently varies from 24 to 28 feet, and the improvement <br />will result in a 32-foot wide street. <br />Nardini stated that she wants to know that water will go where it <br />has been proposed to go. She indicated that she is willin~ to pay <br />for the curb and gutter improvement if it will protect her property. <br />Kneeland asked about the removal of mailboxes as well as the <br />loca:ion of the low point of County Road B-2. Kneeland stated <br />that he was not sure what the plan was for the ditch and asked if <br />piping would be installed and fill placed over that piping. <br />The City Engineer reported that mailboxes will be temporarily <br />relocated if necessary, and then permanently located at the <br />
The URL can be used to link to this page
Your browser does not support the video tag.