Laserfiche WebLink
QUANTITY TRACKING BY AREA2025 STREET IMPROVEMENTSCITY OF LITTLE CANADA, MNBMI PROJECT NO. 24X.13577200DATE: 7/16/2025QUANTITY COST QUANTITY COST QUANTITY COST QUANTITY COST QUANTITY COST QUANTITY COST QUANTITY COST QUANTITY COSTSPOONER PARKINGLOT2025-PARKS-11SPOONER TRAIL2025-PARKS-14PIONEER PARKINGLOT2025-PARKS-25VEG RESTORATION2025-PARKS-54SPRUCE SINKHOLENADEAU2025-PW-41STONERIDGE2025-PW-80MAPLE LEAF2025-PW-79TOTAL COSTITEM NUMBERITEM DESCRIPTIONPROJECT TOTALUNITAS BID UNIT PRICESPRUCE STREET SINK HOLE - ADD TO STORM SEWER110 REMOVE AND REPLACE BITUMINOUS PAVEMENT SY $79.76111 PATCH DOGHOUSEEA $202.04112 PATCH LIFT HOLEEA $134.69CHANGE ORDER NO. 1113 15" RCP PIPE CLASS V 16 LF $86.55$1,384.8016 $1,384.80$1,384.80$1,384.80CHANGE ORDER NO. 2114 4" CONCRETE SIDEWALK REMOVE & REPLACE SF $10.00115 REMOVE CURB AND GUTTER (SPOT REPAIR) LF $13.87116 CONCRETE CURB AND GUTTER (SPOT REPAIR) LF $30.08117 6" CONCRETE PEDESTRIAN CURB RAMP SF $10.03118 TRUNCATED DOMESSF $75.21119 STORM DRAIN INLET PROTECTION 1 EA $450.60$450.601 $450.60120 MACHINE SLICED SLIT FENCELF $1.99121 SAWCUT BITUMINOUS PAVEMENT LF $2.50122 REMOVE BITUMINOUS PAVEMENT SY $4.69123 REMOVE BITUMINOUS PAVEMENT - TRAIL 590 SY $7.68$4,531.20590 $4,531.20124 SUBGRADE EXCAVATION (SPOT CORRECTION) CY $37.63125 FINISH GRADING - TRAIL 590 SY $2.50$1,475.00590 $1,475.00126 TYPE SP 9.5 WEARING COURSE MIX - TRAIL 110 TON $108.00$11,880.00110 $11,880.00127 COMMON TOPSOIL BORROWCY $36.99128 SEED MIX RT, FERTILIZER, HYDRAULIC MULCH SY $1.28129 SEDIMENT CONTROL LOG TYPE WOOD FIBER 497 LF $3.45$1,714.6530 $103.50 467 $1,611.15$20,051.45$103.50 $19,947.95GRAND TOTAL TO-DATE $496,002.43 $14,187.44 $36,870.94 $11,310.03 $73,554.36 $37,088.50 $17,088.24 $305,902.92GRAND TOTAL TO-DATE (LESS 5% RETAINAGE) $471,202.31 $13,478.07 $35,027.39 $10,744.52 $69,876.64 $35,234.07 $16,233.83 $290,607.78PREVIOUS PAYMENTS $318,630.57$68,984.69 $32,963.28 $216,682.60AMOUNT DUE THIS PAY VOUCHER $152,571.74 $13,478.07 $35,027.39 $10,744.52 $891.95 $2,270.79 $16,233.83 $73,925.18CHANGE ORDER NO. 2 =CHANGE ORDER NO. 1 =PART 6: SPRUCE STREET =7/16/2025, 3:20 PMQUANTITY TRACKINGBolton & Menk, Inc.Page 4 of 4