Laserfiche WebLink
<br /> MINUTES <br /> CITY COUNCIL <br /> SEPTEMBER 9, 2009 <br /> MANHOLE The Public Works Superintendent reviewed his report dated September 2, <br /> REHABILI- 2009 relative to the need to rehabilitate eleven manholes and two storm <br /> TATION sewer catch basins. These rehabilitation needs were identified as part of <br /> the City's continuing efforts to address inflow and infiltration issues. <br /> The Superintendent reported that the rehab is done by ]mocking mineral <br /> deposits off the walls and pressure washing the entire structure. Large <br /> cracks and voids are grouted, and then the entire structure is coated with a <br /> mortar coating. The Superintendent recommended that manhole grouting <br /> need only be done in the lower portion of the manhole, rather than the <br /> entire structure. <br /> The Superintendent reviewed the quotes received for this work, with the <br /> low quote from Visu-Sewer, Inc. He recommended Option 2 for manhole <br /> work, again noting that this would involve the lower portion of the <br /> manhole structure. The cost of this work will come from the Water & <br /> Sewer Capital Replacement fund. <br /> The Superintendent indicated that the work may not occur until the spring <br /> depending on Visu-Sewer's schedule. However, the quote will be good <br /> until that time. <br /> Mr. Blesener introduced the following resolution and moved its adoption: <br /> RESOLUTION NO. 2009-9-217-AWARDING THE QUOTE OF <br /> VISU-SEWER, INC., OPTION TWO FOR MANHOLE WORK IN THE <br /> AMOUNT OF $7, 700.00, AND OPTION ONE FOR CATCH BASIN <br /> WORKAT $175.00/t!F. <br /> The foregoing resolution was duly seconded by Keis. <br /> Ayes (4). <br /> Nays (0). Resolution declared adopted. <br /> RICE STREET/ The City Administrator reported that the County may be moving forward <br /> HIGHWAY 36 with replacement of the Rice Street Bridge over Highway 36 as soon as <br /> BRIDGE - next year. The County has a $5 million commihnent for this project in <br /> EASEMENT stimulus funding, and are working on lining up additional funding. As <br /> ISSUES part of the project, the County needs easements for sidewalk <br /> improvements from County Road B to County Road B-2. 7"wo sites <br /> involved are City property that is part of the Melancon Plat as well as the <br /> Hostess Bakery property. The Administrator recommended that rather <br /> than go through an appraisal and sell the easement over the Melancon Plat <br /> to the County, that the City donate the easement area. He also <br /> recommended that given the City's interest in acquiring the bakery <br /> property for improvement issues related to the Rice Street/County Road <br /> 12 <br /> <br />