As in previous years the Watershed's current enacted stormwater treatment <br />regulations require infiltration of the first inch of storm water runoff from <br />impervious surfaces. Previous street projects the City completed utilized <br />rainwater gardens to achieve this infiltration standard therefore, in a continued <br />effort to effectively treat storm water, rainwater gardens will once again be <br />considered for treatment of storm water runoff along this roadway. Options will <br />be reviewed for reducing the amount of pavement at the large first cul -de -sac <br />B. ASPEN CIRCLE <br />Aspen Circle is proposed to be milled two inches deep and overlaid with a new <br />bituminous surface. The paving will occur in such a manner to ensure the proper <br />crown of the roadbed is restored. It is anticipated that sections of curb and gutter <br />will need to be replaced due to damage or poor drainage characteristics. Due to <br />the. severity of the surmountable curb grade we are also proposing to have the <br />curb and gutter removed at all driveways. The driveway curb will be repoured to <br />provide a more smooth driveway access. This work will require that the resident <br />replace at least a portion of their driveway. As was done on Ontario Road last <br />year, the driveway work would be completed outside the City contract and the <br />cost would be the responsibility of the property owner. If a property owner would <br />choose to not have their driveway approach altered, they would receive a credit <br />for any curb not replaced in front of their driveway. Only minor structure <br />rehabilitation and repair anticipated on the sanitary and storm sewer. <br />C. ONTARIO ROAD <br />Ontario Road is proposed to be full depth milled and overlaid with a new <br />bituminous surface. It is proposed to mill the entire bituminous section and <br />repave two lifts of blacktop. The existing gravel roadbed will be shaped to <br />ensure proper drainage to the gutter and test rolled to determine any areas of <br />subgrade correction that are needed prior to paving. It is anticipated that several <br />sections of curb and gutter will need to be replaced. Due to the severity of the <br />surmountable curb grade we are also proposing to have the curb and gutter <br />removed at all driveways. The driveway curb will be repoured to provide a more <br />smooth driveway access. This work will require that the resident replace at least <br />a portion of their driveway. As was done on Ontario Road last year, the driveway <br />work would be completed outside the City contract and the cost would be the <br />responsibility of the property owner. If a property owner would choose to not <br />have their driveway approach altered, they would receive a credit for any curb <br />not replaced in front of their driveway, Only minor structure rehabilitation and <br />repair anticipated on the sanitary and storm sewer. <br />D. JESSICA COURT <br />Jessica Court is proposed to be milled two inches deep and overlaid with a new <br />bituminous surface. The paving will occur in such a manner to ensure a proper <br />crown of the roadbed is restored. It is anticipated that after milling some areas <br />may need to be full depth patched prior to repaving of the bituminous wear <br />course. It is also anticipated that sections of curb and gutter will need to be <br />replaced. <br />-7. <br />10 <br />