• Energy efficient lighting will be reviewed in 2008 for interior lighting of Fire <br />Station, Parks Maintenance Shop, and City Hall It is thought that replacing <br />existing light fixtures, ballasts, switches, etc., will result in overall energy savings <br />in these buildings. An energy study /audit will be conducted on each building prior <br />to proceeding to determine cost benefit. Budgeted costs are preliminary estimates. <br />• The 2007 Old Fire Hall building repair of $13,000 represented the estimated cost <br />to repair the flooring in Parks maintenance shop. The concrete floor in the garage <br />area of the Parks Maintenance Shop is coated with a waterproof, non -slip surface <br />that has chipped off and deteriorated since it was installed about 30 years ago. It <br />serves a dual purpose by creating a safer working surface for employees when the <br />floor gets wet and keeps water from entering the ceiling of the rental hall from <br />melting snow and washing equipment in the shop above. Further review of the <br />products available was completed in 2007. The cost estimate for the appropriate <br />product is $15,000. <br />• The Pioneer Well System has been budget to be repaired in 2008. The irrigation <br />well has had several major pipe breaks in recent years resulting in several <br />thousand dollars in repairs each summer. To correct the situation we are <br />evaluating a new "slow start" electronic system for the pump that would eliminate <br />the surge of water through the system currently created when the existing pump <br />turns on. Lee Elfering has knowledge of these systems and will be making a <br />recommendation prior to proceeding with this purchase. The current repair <br />estimate is $19,000. <br />• The 2007 budget included costs for renovating the Spooner and Pioneer Tennis <br />Counts in 2008. The tennis court renovation that was completed in 2007 with the <br />asphalt resurfacing. The lighting portion of the project will be completed in 2008. <br />The original light poles and fixtures installed in the late 1970's are in need of <br />replacement. The cost estimate of $50,000 is based on similar past lighting <br />projects. <br />• Replace of the lighting at Rink #1 (Little Canada Road) is budgeted for 2008. The <br />existing rink lighting was installed in the early 1970's. The wooden poles as well <br />as the fixtures have deteriorated to the point of needing to be replaced. Removing <br />the overhead wiring and placing it underground would also serve to clean up the <br />complex. Preliminary cost estimate is 328,000. <br />• The Purchase of a Bobcat Milling Implement has been budgeted for 2008 at an <br />estimated cost of $12,500. This piece of equipment will allow us to patch streets <br />using a cleaner, more permanent method. The milling machine grinds up the <br />asphalt to a desired depth and leaves a good surface for new asphalt to adhere to <br />old asphalt and also keeps the edges straight for a better appearance. This will <br />enable us to fix heaves and dips in the road along with prepping streets for seal <br />coating. <br />