• The Asphalt Roller is scheduled for replacement in 2008 at an estimated cost of <br />$26,000. We are currently using a 1986 Beuthling Roller that we purchased used <br />from the City of Edina. Roller technology has come a long way since we <br />acquired our current roller and the new rollers are smaller, easier to maneuver, <br />faster, and provide a better line of sight for the operator. Additionally the roller <br />we currently have is probably bigger than what we need for the types of street <br />maintenance we perform in- house. <br />• The Wood Chipper is scheduled for replacement in 2008 at an estimated cost of <br />$35,000. We purchased our current used chipper, a 1993 model, in February <br />2004. Since then we have put over 350 hours of use on it. We have had trouble <br />running it on hot summer days and on cold winter days because it uses unleaded <br />gas. It also has a smaller than desired opening for feeding brush so it tends to jam <br />up a lot and slow the operation down. The proposed chipper is a diesel that stands <br />up better under extreme weather conditions and provides over 50 more <br />horsepower. The extra horsepower will allow us to chip larger diameter wood <br />rather than hauling it away. The chute is also larger to make feeding brush easier. <br />We do a lot of trimming in the winter in both Parks and Public Works and a new <br />diesel chipper should allow us to be more efficient and get more trimming done <br />while we have the time to do it. <br />Overall the Capital Improvement Fund balance is being sustained as reasonable levels to <br />allow for scheduled capital replacement needs and new acquisitions. However, we would <br />like to note that the Fire Department's next truck replacement, while approximatelyl0 <br />years down the road, will be a significant outlay. The cost of replacing the ladder truck <br />is somewhere in the 1.0 -1.4 million range, as an early ballpark guess. Given the <br />significance of the expenditure Staff would recommend that the Council consider <br />establishing a program that will start building finds now to meet this future <br />expenditure and thus avoiding a dramatic levy impact down the line. We could <br />establish a reverse within the General Capital Improvement fund that would build to <br />an adequate level by replacement date. More specifically a portion of the projected <br />2008 surplus could be used to establish an initial funding of this reserve. An annual <br />funding requirement could then be then be determined and budgeted for within the <br />GCIP Fund. We would also discuss with the Fire Department their interest in <br />participating in the funding program. <br />10% Fund: <br />• The electrostatic painting of the playground structures at Pioneer was completed <br />in 2007 and Spooner was deferred to 2008. <br />Infrastructure Fund: <br />The streets being considered for improvement in 2008 are as follows: <br />