Laserfiche WebLink
Schematic Design (SD) <br />Based on City acceptance of the predesign findings in the TAC report, the consultant shall prepare <br />schematic design drawings and renderings indicating the scale and relationships of project components <br />that conform to the approved space needs programming. <br />• Coordinate with City planning and zoning staff to facilitate plan reviews during SD <br />• Prepare drawings and specification narratives to the City at 100% completion of Schematic Design <br />(“SD”) <br />• Prepare a cost estimate to deliver to the City based on 100% SD set <br />• Incorporate stakeholder input, City comments, and costing information for the next phase of <br />design <br /> <br />Design Development (DD) <br />The proposer shall complete the following tasks during the Design Development (DD) phase: <br />• Coordinate with City staff and appropriate agencies to conduct plan reviews during DD <br />• Prepare drawings and outline specifications to the City at 100% completion of DD <br />• Prepare a cost estimate to deliver to the City based on 100% DD set <br />• Incorporate stakeholder input, City comments, and costing information for the next phase of <br />design <br /> <br />Construction Documents (CD) <br />During the Construction Documents (CD) phase, the proposer shall: <br />• Coordinate with City staff and appropriate agencies to conduct plan reviews during CD <br />• Update costing information based on the completion of a 50% CD progress set <br />• Prepare drawings and full specifications to the City at 100% completion of the CD set <br /> <br />Bidding <br />In coordination with the City, the proposer shall: <br />• Assist with development of bid package(s), including invitation to bid, instructions to bidders, <br />forms, and supplemental documents necessary to convey project requirements. <br />• Attend and lead pre-bid meetings. <br />• Prepare addenda as needed during the bidding process.