Laserfiche WebLink
Lot 3 is a 7.9 acre parcel that will serve as the site for the Drywall Supply business. <br />This site includes two existing buildings that would remain for the use of the applicant's <br />business, as well as a 4,400 square foot office addition to the northern building. The <br />applicant shows the southernmost storage canopy as being modified or removed, and a <br />future building of 20,000 square feet in the southeast corner of the property. Across the <br />south portion of the lot (about 84,300 square feet), the applicant proposes an outdoor <br />storage and truck parking area. Circulation through this parcel would include truck <br />access from the driveway along the east property line (across Lot 1), turning through the <br />property to the west, the exiting the site via the central driveway to Country Drive. Just <br />ten parking stalls are shown serving the Drywall Supply site, plus parking and loading <br />for trucks. <br />Issues <br />Site Layout. This issue had been raised with the applicant previously, and related to the <br />intent of the City to maximize the development capacity of Lot 1, the undeveloped <br />parcel. The applicant has responded to this request by moving the proposed lot line to <br />the south approximately 150 feet to accommodate more intensive development of the <br />future building parcel, and added a 4,400 square foot office addition to one of the <br />existing buildings. This change appears to address the staff's recommendations in this <br />regard. <br />Circulation and Parking The circulation plan utilizes three access points from Country <br />Drive. The access points at the northeast corner and in the center of the site are <br />existing curb cuts previously constructed for the Knox parking lot. The access point in <br />the northwest corner is new, and would provide access to a new parking lot north of the <br />main Knox building on Lot 2. Truck circulation would be shared between the three lots, <br />and the applicant will need to develop a set of cross - easements and maintenance <br />agreements between the three parcels to ensure that the PUD will continue to provide <br />access to the occupants of the project. <br />With regard to parking, the plans do not detail parking supply for Lot 1. Because a final <br />site plan will not be completed until a user is found for the site, no parking layout would <br />be necessary at this time. There appears to be adequate area on the site to <br />accommodate a building of the size proposed, or greater, depending upon the mix of <br />uses in the building. <br />For Lot 2, 85 parking spaces are shown. The plan notes state that the building is two <br />stories, however, only a portion of the building is developed this way. The "footprint" of <br />the building is 46,568 square feet. Because we do not know the total size of the <br />building or the mix of uses, it is difficult to determine the parking requirement at this <br />time. However, at the footprint size shown, only 20% of the building could be occupied <br />by office and the site would already be underparked. An alternative parking plan should <br />be developed for the former Knox building site that identifies the total usable square <br />footage of the building, and the maximum number of parking spaces available on the <br />lot. <br />