My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-14-2002 Council Agenda
>
City Council Packets
>
2000-2009
>
2002
>
08-14-2002 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2014 2:15:24 PM
Creation date
5/14/2012 9:48:14 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR <br />Michael I. Fahey <br />COUNCIL <br />Beverly Sealze <br />Jim LaValle <br />Matt Anderson <br />Rick Montour <br />515 Little Canada Road, Little Canada, MN 55117-1600 ADMINISTRATOR <br />(651) 766 -4029 / FAX: (651) 766 -4048 Joel R. Hanson <br />www. ci.li t Ile- canada. mn. us <br />MEMORANDUM <br />TO: Mayor Fahey & Members of the City Council <br />FROM: Greg Schroeder, Public Works Director <br />DATE: August 8, 2002 <br />RE: Stabilize Round Lake Pond <br />At the July 24, 2002 City Council meeting we briefly discussed our obligation to maintain the <br />water level in the Round Lake Storm water pond. We were proposing to use a 6" diameter well <br />and pump to accomplish this. The reason we selected this size well was to enable us to also <br />provide water to stabilize the water level in the storm water pond that will be built along Market <br />Place Drive as part of that improvement project. <br />As you may recall we are obligated to Lakeside Apartments to maintain a minimum of 3 feet of <br />water in the Round lake Pond. The City Engineer has estimated that during a dry year, we would <br />need to provide 75,000 gallons of water to the pond 8 times to meet our obligation. This can be <br />accomplished by either filling the pond from a city fire hydrant or from a well. Below are the <br />estimated costs for each; <br />City Crew Hydrant Fill One Pond <br />Labor /Equipment per time (1.5 hours) $ 42 <br />Cost of Water per time (75,000)($1.30) $ 98 <br />Subtotal $140 <br />Number of times 8 <br />Total Cost/dry year $1,120 <br />Fill Pond from Round Lake (4 hour fill time) <br />Labor per time (.5 hours) $ 14 <br />Number of times 8 <br />Subtotal $ 32 <br />Pump and Piping ($7,000 over 10 -year Life) $700 <br />Total Cost/dry year $732 <br />H: \orcgS \Round Lake Costs3.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.