Laserfiche WebLink
Base Bid <br />Parking Lot, Trail, <br />Electrical Upgrades <br />Alternate Bid 1 <br />Parking Lot Light <br />Alternate Bid 2 <br />South Electrical <br />Receptacle <br />Total Base Bid + <br />Alternate Bid 1 + <br />Alternate Bid 2 <br />Engineer’s Estimate $170,890.00 $14,000.00 $8,000.00 $192,890.00 <br />Omann Contracting <br />Companies, Inc. $139,926.50 $8,480.00 $10,400.00 $158,806.50 <br />Clark Companies $154,785.00 $23,500.00 $13,500.00 $191,785.00 <br />Blackstone Contractors, <br />LLC $158,827.01 $7,927.50 $3,911.25 $170,665.76 <br />Kevin Dunaway dba <br />Dunaway Construction $165,565.50 $5,692.00 $3,905.00 $175,162.50 <br />Valley Paving, Inc. $174,891.00 $6,200.00 $4,200.00 $185,291.00 <br />Winberg Companies LLC $175,887.08 $6,369.30 $4,100.25 $186,356.63 <br />Pember Companies, Inc. $175,977.70 $6,035.00 $4,150.00 $186,162.70 <br />Sunram Construction, <br />Inc. $176,265.00 $6,275.00 $4,100.00 $186,640.00 <br />New Look Contracting, <br />Inc. $178,520.65 $7,200.00 $4,625.00 $190,345.65 <br />Bituminous Roadways, <br />Inc. $181,672.50 $6,395.00 $4,385.00 $192,452.50 <br />Dreamland Contracting <br />LLC $184,825.34 $12,475.84 $9,588.34 $206,889.52 <br />Urban Companies, LLC $205,236.50 $9,000.00 $5,258.00 $219,494.50 <br />After including construction contingency and anticipated project indirect costs, the estimated total <br />project costs are itemized below. <br />Base Bid <br />Parking Lot, Trail, <br />Electrical Upgrades <br />Alternate Bid 1 <br />Parking Lot Light <br />Alternate Bid 2 <br />South Electrical <br />Receptacle <br />Total Base Bid + <br />Alternate Bid 1 + <br />Alternate Bid 2 <br />Low Bid (Omann) $139,926.50 $8,480.00 $10,400.00 $158,806.50 <br />+10% Contingency $13,992.65 $848.00 $1,040.00 $15,880.65 <br />+30% Indirect $41,977.95 $2,544.00 $3,120.00 $47,641.95 <br />Total Project $195,897.10 $11,872.00 $14,560.00 $222,329.10