We will need to ensure we are maintaining adequate pedestrian access from the senior <br />projects to the shopping center until the streetscape work is done. Coordination with <br />CommonBond may also help decided these timing issues. <br />• Market Place parking lot. I have proposed to Mr. Grootwassink that we could include the <br />work under our contract and assess him an additional amount for this work. This would be <br />subject to a development agreement and advice from the City Attorney as this concept's <br />permissibility. <br />• Staff would recommend proceeding with this project subject to the resolution of the above <br />referenced issues. (Streetscape timing would not have to be decided upon until the <br />improvement hearing.) <br />Ryan Drive <br />• This project involves the correction of the heaving areas along Ryan Drive. These areas have <br />been a continual problem along this roadway. They were once thought to be occurring due to <br />the surcharging (settlement) caused by the Frador Recycling piles. However, surcharging <br />should have been completed long ago and it is obvious other factors are at work. <br />• It is believed (based on comments by adjoining landowners) that old wood pilings are present <br />in this area from an old railroad line. (We are attempting to confirm this.) If that is correct, <br />the heaving is then caused by the road settling around the pilings which are not moving. To <br />correct this, we would need to dig down and either remove the pilings or cut them off below <br />the subgrade to allow for future settlement. <br />• Two options were reviewed, one involved 600 feet of repair and the other 1200 feet (virtually <br />the entire stretch from Ryan Lane to County Drive). <br />• The four property owners present favored reconstructing the 600 foot area by subcutting the <br />road, adding three to four feet of sand fill, a petromat liner, a foot or so of recycled class V, <br />and four inches or bituminous. It is believed this would address the problem. <br />• We did a cost/benefit analysis of other options, including a continuance of grinding off the <br />humps and overlaying the road. (A practice previously used on this area.) While initially <br />less costly, it proves to be more expensive in the longrun as you continue to redo this step <br />every five years or so. <br />• Staff proposed the entire Ryan Industrial Park area be assessed using a 50% area/50% front <br />footage method. (This was the same formula used in the 1993 project.) <br />• Those present asked if the City was going to participate. (In the 1993 project, we contributed <br />20 %, the former developer contributed 20 %, and the property owners were assessed 60% for <br />10 years with the Last payment in 2003.) Given this correction is really an extension of the <br />1993 project, I would recommend we participate at the 20% rate. <br />• The key concern with this project is the vast majority of the property owners were not <br />present. They may not be interested in further assessments. However, Staff would strongly <br />recommend the approach we have outlined here to best serve the public's interest. <br />Sextant <br />• This is essentially the same project as discussed last year. The major change is we are <br />proposing to reconstruct the entire section of roadway from McMenemy instead of just the <br />portion east of Arkwright. This change by staff was done due to the condition of the sanitary <br />sewer line and the roadway in this area. (We initially avoided the piece from McMenemy to <br />Arkwright to avoid inconvenience more of the neighborhood. However, we feel this work is <br />warranted at this time.) <br />Page 167 <br />