My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-26-2001 Council Agenda
>
City Council Packets
>
2000-2009
>
2001
>
09-26-2001 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2012 1:56:13 PM
Creation date
6/25/2012 1:42:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
not limited to, the permit required by the Minnesota Department of Health <br />due to the water main extension, any necessary permits required from the <br />Minnesota Pollution Control Agency for sanitary sewer main extension, any <br />necessary approvals from Metropolitan Council - Wastewater Services Division <br />for connections to sanitary sewer lines, any permit required from the <br />Ramsey - Washington Watershed District for grading and storm water discharge, <br />and any permits or approvals necessary to comply with wetland regulations. <br />The Developer shall reimburse the City for any costs or expenses incurred <br />by the City due to the need for any permits or consents, and shall be <br />responsible for compliance with any other requirements imposed by the <br />agencies in question. <br />4. Development Exhibits. The Developer shall develop the proposed <br />plat in accordance with Exhibit "A ", attached hereto, and on file in the <br />offices of the City; and in accordance with City Council Resolutions <br />No. 2001 -2 -47 adopted on February 28, 2001 and No. 99 -12 -255 adopted <br />December 15, 1999. <br />5. Required Improvements. The Developer shall install, at his own <br />expense, the extension of public improvements consisting of water main, <br />sanitary sewer main, storm sewer, concrete curb and gutter, the first lift <br />of the bituminous roadway, signage, and lighting, with all public <br />improvements to be completed no later than November 15, 2001. Any lighting <br />which may become an ongoing City expense shall be coordinated with the City <br />and Xcel Energy to minimize future operational costs with Developer to bear <br />system installation costs to allow City to attain Xcel Energy's "Customer <br />Owned Group V" rate. The second lift of asphalt for the bituminous roadway <br />is to be completed by Developer no later than July 1, 2002. Original plans <br />and subsequent changes for said improvements shall be prepared by Charles <br />Page 83 <br />
The URL can be used to link to this page
Your browser does not support the video tag.