My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-25-2000 Council Agenda
>
City Council Packets
>
2000-2009
>
2000
>
10-25-2000 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2012 2:04:36 PM
Creation date
6/26/2012 2:01:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM . <br />NO. <br />DESCRIPTION <br />1 <br />CONTRACT ITEMS <br />THIS PERIOD TOTAL TO DATE <br />UNIT QTY. UNIT QTY. AMOUNT QTY. AMOUNT <br />PRICE <br />SCHEDULE 4.0- ARCADE STREET <br />1 TYPE 41 WEARING COURSE MIXTURE <br />2 BITUMINOUS MATERIAL FOR TACK COAT <br />T SCHEDULE 4.0•ARCADE STREET -TOTAL <br />TON 1360 327.85 0 30.00 1080 $30,078.00 <br />GAL 820 31.00 0 30.00 400 3400.00 <br />30.00 330,478.00 <br />SCHEDULE 5.0- CHANGE ORDER #1 <br />1 INSTALL FIBER OPTIC CABLE LS 1 342,000.00 0 30.00 1 342,000.00 <br />2 SUBSTITUTE ARCH PIPE LS 1 32,252.70 0 30.00 1 $2,252.70 <br />3 EXPLORATORY DIGGING (WATER SERVICE) L5 1 3200.00 0 30.00 1 5200.00 <br />4 DRAINAGE SWALE W/ FIELD STONE RIP RAP LS 1 32,820.00 0 $0.00 1 32,820.00 <br />5 CHANGE FROM 6-FOOT T05 -FOOT FENCE LS 1 .$645.00 0 30.00 1 - 3645.00 <br />6 LOWER HYDRANT LS 1 3650.00 0 30.00 1 3650.00 <br />7 REMOVE CONCRETE LINED CMP LS 1 32,170.00 0 30.00 1 32,170.00 <br />8 CONSTRUCT POND AND SWALE LS 1 $4,800.00 0 30.00 1 $4,800.00 <br />9 TRAIL EXCAVATION LS 1 3600.00 0 30.00 1 3600.00 <br />10 RECONSTRUCT EXISTING MANHOLE LS 1 32,414.00 0 30.00 1 32,414.00 <br />T SCHEDULE 5.0- CHANGE ORDER #1 -TOTAL <br />BASE BID SUMMARY <br />SCHEDULE 1.0 EAST BROOKS STREET RECONSTRUCTION - TOTAL <br />SCHEDULE 2.0 VIKING DRIVE RECONSTRUCTION - TOTAL <br />SCHEDULE 3.0 MINNESOTA AVENUE RECONSTRUCTION - TOTAL <br />SCHEDULE 4.0 ARCADE STREET - TOTAL <br />SCHEDULE 5.0- CHANGE ORDER #1 -TOTAL <br />BASE BID SUMMARY • TOTAL <br />30.00 357,261.70 <br />3470.00 368,230.39 <br />3470.00 3508,506.62 <br />31,282.50 3117,051.89 <br />30.00 330,478.00 <br />30.00 357,261.70 <br />32.222.50 3781,528.60 <br />AMOUNT EARNED <br />. AMOUNT RETAINED <br />MATERIAL ON SITE <br />MATERIAL DEDUCT' <br />PREVIOUS PAYMENTS <br />AMOUNT DUE <br />TOTAL THIS PERIOD <br />32,222.50 <br />($40,559.70) <br />30.00 <br />30.00 <br />$42,782.20 <br />TOTAL TO DATE' <br />3781,528.60 <br />30.00 <br />331,887.90 <br />331,887.90 <br />3738,746.40 <br />$42,782.20 <br />' De0uct for recycled aggregate base Gass 5 from Pay Estimate #1 <br />8051401 -Penal Payest <br />Page 56 <br />
The URL can be used to link to this page
Your browser does not support the video tag.