The contributing flow into the swale can be referenced to three general contributing areas <br />including land within Little Canada, Vadnais Heights, and Ramsey County. Two options for a <br />construction cost split between the three contributors have been explored and include the <br />following: <br />• Cost Split Based on Contributing Areas — this option will be based on the contributing <br />areas as referenced in Mr. Terry Noonan's letter dated June 17, 1998. <br />• Cost Split Based on Peak Flows for a 10 -year Storm Event — this option will be based on <br />the contributing flows as referenced in Mr. David Nyberg's memo dated September 30, <br />1998. <br />The overhead costs, except construction staking and construction inspection, will be assumed <br />entirely by the City of Little Canada, as they were the initiators of the project. Construction <br />staking and inspection are directly related to the construction and are included in the total <br />construction costs, not the overhead costs. The overhead costs include Preliminary <br />Engineering, Project Engineering, Topographical Survey, and Construction Administration. <br />Below is a breakdown of the overhead costs assumed by the City of Little Canada. <br />Overhead Cost Split <br />The City of Little Canada will assume responsibility for all overhead costs as the initiator <br />of the project. Below is a breakdown of the estimated overhead costs for the project. <br />Preliminary Engineering <br />Project Engineering <br />Topographical Survey <br />Construction Administration <br />Total Estimated Overhead Costs <br />$1,600.00 <br />$6,000.00 <br />$1,000.00 <br />$1,000.00 <br />$9,600.00 2 3c- <br />zz _toa /Y0 -46, <br />splits between Little <br />i <br />Below is a breakdown of the cost split for each of the two constructions <br />Canada, Ramsey County, and Vadnais Heights: <br />Construction Cost Split Based on Contributing Areas <br />Total estimated construction cost <br />Construction Staking <br />Construction Inspection <br />Total Project Cost <br />= $42,000.00 <br />= $ 1,000.00 <br />= $ 2,000.00 <br />= $45,000.00 <br />Contributor <br />Contributing Area <br />% Total Area <br />Cost Share <br />Little Canada <br />Ramsey County <br />Vadnais Heights <br />1.62 acres <br />1.41 acres <br />4.70 acres <br />20.96% <br />18.24% <br />60.80% <br />$9,432.00 <br />$8,208.00 <br />$27,360.00 <br />-,owar <br />O:\PROJ\804490j \0325 \490- 2104.octdoc C( <br />Page 135 <br />any <br />