My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-14-1988 Additions
>
City Council Packets
>
1980-1989
>
1988
>
12-14-1988 Additions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2013 10:56:23 AM
Creation date
6/11/2013 10:55:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />December 12, 1988 <br />Amoco Pipeline <br />Mr. Peterson mentioned that most likely the pipeline would <br />be relocated. The existing pipeline would stay in place <br />and a new line would be constructed. However, he did not <br />see this taking place until sometime in May. <br />I called Ed Oniak of the Federal Pipeline Safety Board in <br />Kansas City. He was not in but the secretary informed me <br />that someone else would call me back. At 1:30 p.m. Zach <br />Barrett called, I told him the problem we were having and <br />one of his main concerns was what existed first, the <br />trailer park or the pipeline, and I informed him that the <br />pipeline was in existence first. He explained that in this <br />matter there is very little the Federal Government can do. <br />However, he is going to research the law, contact Amoco and <br />call me back with some of his results. <br />dl <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.