Laserfiche WebLink
ARDEN HILLS, MINNESOTA <br />SEH prepared comprehensive drainage plans on a segmental basis <br />resulting in the evolvement of a near complete community -wide <br />storm drainage plan. <br />BAYPORT, MINNESOTA <br />A comprehensive plan was prepared for the entire city which <br />included delineation of watershed boundaries, inventory of <br />existing structures and a proposed storm water management plan. <br />BROOKLYN PARK, ^MINNESOTA <br />SEH used the SCS TR -20 computer model for the hydrologic analysis <br />of a rural and urban watershed of about two square miles. The <br />analysis, in conjunction with the reconstruction of 85th Avenue, <br />resulted in the recommendation for and construction of a large <br />box culvert and related ditch improvements to handle future storm <br />water flows. <br />LAKELAND, MINNESOTA <br />A city wide drainage study was completed to determine the <br />ultimate storage needs. The plan was the first step of the <br />City's 509 surface water management plan. <br />MAPLEWOOD, MINNESOTA <br />Several small studies have been prepared which have been used to <br />update the City's comprehensive drainage plan. <br />MOUNDS VIEW, MINNESOTA <br />Two recent hydrologic studies have been completed for the City. <br />The reports will be used as a basis for a city -wide surface water <br />plan. <br />NEWPORT, MINNESOTA <br />In 1975, a Comprehensive Storm Drainage Plan was prepared. This <br />plan provided a comprehensive drainage plan for future <br />development. <br />Page 10 <br />- 12 - <br />