Laserfiche WebLink
BIDS FOR PIONEER PARK SITE IMPROVEMENTS <br />Bidder Base Bid Alt. 1 Alt. 2 Alt. 3 Total <br />Buck Blacktop 97,190.26 7,100.00 4,200.00 8,600.00 3,17,090.26 <br />Volkman 109,068.70 6,300.00 5,760.00 5,250.00 126,378.70 <br />BE Construction 110,548.50 6,308.00 4,675.00 5,375.00 126,906.50 <br />Arrigoni 113,500.00 9,400.00 5,567.50 7,500.00 135,967.50 <br />Ashbach 136,494.80 6,810.00 5,790.00 4,300.00 153,394.80 <br />DN Construction 137,108.85 6,176.00 5,234.00 7,310.00 155,828.85 <br />Barber 136,373.40 8,000.00 8,686.00 5,805.00 158,864.40 <br />PAGE 51 <br />