Laserfiche WebLink
traffic control signal with street lights and <br />emergency vehicle pre — emption. <br />1) Traffic Control Signal and EVP System. <br />Estimated Construction Cost is $61,755.00 <br />which excludes City furnished materials. <br />Anticipated Federal —aid share is 90 percent. <br />Anticipated State's share is 5 percent. <br />St. Paul's share is 5 percent. <br />2) City furnished materials. Estimated Cost is <br />$13,600.00 which includes controller and <br />cabinet, and EVP,System control and interface <br />equipment. Anticipated Federal —aid share is <br />90 percent. Anticipated State's share is 5 <br />percent. St. Paul's share is 5 percent. <br />b. Trunk Highway No. 49 (Rice Street) at County State <br />Aid Highway No. 30 (Larpenteur Avenue). System <br />"B." S.P. 6214 -63. S.P. 62- 630 -39. Remove the <br />existing traffic control signal and install a new <br />traffic control signal with street lights and <br />emergency vehicle pre — emption. <br />1. Traffic Control Signal. Estimated <br />Construction Cost is $74,288.00 which <br />excludes City furnished materials, and EVP <br />69107 <br />— 6 — <br />Page 22 <br />