Laserfiche WebLink
System materials (cable, detectors and <br />lights). Anticipated Federal —aid share is 90 <br />percent. Anticipated State's share is 5 <br />percent. County's share is 5 percent. <br />2. City furnished materials (Traffic Control <br />Signal). Estimated Cost is $9,800.00 which: <br />1) includes controller and cabinet and 2) <br />excludes EVP System control and interface <br />equipment. Anticipated Federal —aid share is <br />90 percent. Anticipated State's share is 5 <br />percent. County's share is 5 percent. <br />3. EVP System. Estimated Construction Cost is <br />$1,605.00 which: 1) includes EVP System <br />materials (cable, detectors and lights) and <br />2) excludes City furnished materials. <br />Anticipated Federal —aid share is 90 percent. <br />Anticipated State's share is 5 percent. <br />St. Paul's share is 2.5 percent. Roseville's <br />share is 1.25 percent. Maplewood's share is <br />1.25 percent. <br />4. City furnished materials (EVP System). <br />Estimated Cost is $3,800.00 which includes <br />EVP System control and interface equipment. <br />69107 <br />— 7 — <br />Page 23 <br />