Laserfiche WebLink
Anticipated Federal —aid share is 90 percent. <br />Anticipated State's share is 5 percent. <br />St. Paul's share is 2.5 percent. Roseville's <br />share is 1.25 percent. Maplewood's share is <br />1.25 percent. <br />c. Trunk Highway No. 49 (Rice Street) at County State <br />Aid Highway No. 26 (Roselawn Avenue) — <br />McCarron Street. System "C ". S.P. 6214 -63. <br />S.P. 62- 626 -06. Install a new traffic control <br />signal with street lights and emergency vehicle <br />pre — emption. <br />1. Traffic Control Signal. Estimated <br />Construction Cost is $77,776.00 which: <br />1) includes State furnished materials <br />(excluding EVP System control and interface <br />equipment) and 2) excludes EVP System <br />materials (cable, detectors and lights). <br />Anticipated Federal —aid share is 90 percent. <br />Anticipated State's share is 5 percent. <br />County's share is 2.5 percent. Roseville's <br />share is 2.5 percent. <br />2. EVP System. Estimated Construction Cost is <br />$7,601.50 which includes: 1) EVP System <br />69107 <br />— 8 — <br />Page 24 <br />