My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-27-1993 Council Agenda
>
City Council Packets
>
1990-1999
>
1993
>
01-27-1993 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2013 2:45:51 PM
Creation date
8/26/2013 2:43:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Option 5 - Street Reconstruction: <br />The City could have Lake Street reconstructed as a 28 foot wide urban section street with <br />concrete curb and gutter. This alternative is equal to Option 1 except that the street is <br />proposed to be 4 feet narrower, <br />Option 5 - Street Reconstruction <br />Total Est, Proj. cost $113,284.71 <br />Assessed Cost 71 429.40 <br />City cost $41,855.31 * <br />Assessment Rate: $71,429.40 = $58.06/L.F. <br />1,230.29 L.F. <br />* City cost doesn't include assessed cost for Park Property ($17,418). <br />The assessment rate for Option 5 is $58.06/L.F. which is $6.28 less that the rate for Option <br />1. Assessment rates for Options 1 and 5 were determined with the City paying for 20% of <br />the street costs as the City's standard street section was being installed. <br />Itemized costs for Options 4 and 5 are included for your review. <br />Yours very truly, <br />BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. <br />Michael C. Lynch <br />MCL:li <br />Page 2. <br />37213.cor <br />Page 12 <br />£0'd '3GSv )2 OOd12NO9 <br />TTET 929 2T9 9E:,T 2667-EE-TO <br />
The URL can be used to link to this page
Your browser does not support the video tag.