My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-22-1994 Council Agenda
>
City Council Packets
>
1990-1999
>
1994
>
06-22-1994 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2013 2:59:35 PM
Creation date
10/9/2013 2:57:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.5.8. Review shop drawings, samples and other submissions of the <br />Contractor only for general conformance to the design concept of the <br />Project and for compliance with the result required by the Construction <br />Contract. <br />1.5.9. Issue such additional instructions to the contractor as may be <br />necessary to interpret the drawings and specifications or the changes <br />required in the contractor's work. <br />1.5.10. After discussion with the City, prepare Change Orders for work not <br />covered by the Contract for substantial over -run of estimated "contract <br />quantities" as defined in the project's contract documents for the City's <br />approval and execution. -after - discussion f the -same withr° tits. Change <br />Orders shall be processed as soon as practical after written approval <br />thereof has been received by the Consultant from the City. <br />1.5.11. At the request of the City, attend periodic progress meetings with <br />the contractor(s), City representatives, and others who may be interested <br />during the course of the Project to address unique and /or difficult <br />circumstances relating to the Project. <br />1.5.12. Conduct construction progress reviews with the contractor and the <br />City related to the contractor's date of completion and provide periodic <br />written progress report for the Project as requested by the City to address <br />unique and /or difficult projects. <br />1.5.13. Conduct or arrange for appropriate periodic tests during the <br />course of construction to monitor the quality of materials and workmanship. <br />1.5.14. Conduct with 4n<•R -te eresenec of the City's representative(s) a <br />final inspection of the Project as constructed in sufficient detail so as <br />to determine whether it conforms with the design concept of the project as <br />contained in the Contract Documents, and determine whether it is <br />constructed in accordance with the Contract Documents. The Consultant <br />shall prepare a punch list for the contractor, listing thereon work left to <br />Page 82 <br />
The URL can be used to link to this page
Your browser does not support the video tag.